USNS ROBERT E. PEARY - CENTRIFUGAL PUMP OVERHAUL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / MSCHQ NORFOLK has issued a Combined Synopsis/Solicitation (N3220526Q7170) for a Centrifugal Pump Overhaul onboard the USNS ROBERT E. PEARY (T-AKE 5). This unrestricted acquisition requires specific parts for the central sea water pump. Quotes are due June 08, 2026, at 10:00 AM.
Scope of Work
This requirement involves the overhaul of centrifugal pumps, specifically the procurement of two (2) Impellers (Item 0001) and four (4) Casing Rings (Item 0002). Both items require adherence to DFARS 252.211-7003, "Item Identification and Valuation," and have a Manufacturer's Part Number of 5363A. A justification for other than full and open competition indicates a requirement for "Central Sea Water Pump parts" from Sims Pump Valve Co., identified as the Original Equipment Manufacturer (OEM) holding proprietary rights to drawings. Standardization and compatibility requirements specify "Simsite SMS 300" and related parts (5363B, 5363A) to maintain fleet configuration and ensure compatibility with existing equipment on "All T-ake Vessels."
Contract & Timeline
- Type: Combined Synopsis/Solicitation (implied Firm Fixed Price for items)
- Set-Aside: Unrestricted
- Published Date: May 27, 2026
- Quote Due Date: June 08, 2026, 10:00 AM (Eastern Time)
- Delivery Due Date: On or before August 10, 2026
- Place of Performance: Norfolk, VA 23511, United States
Submission & Evaluation
Quotes must be submitted via email to the contracting officer and contract specialist. Evaluation will be based on Technical (meeting solicitation requirements, including parts, delivery dates, terms, and conditions) and Price (reasonableness). The Government may negotiate and seek revisions. Vendor's standard commercial terms and conditions may be considered a material defect.
Additional Notes
FAR clauses 52.212-1, 52.212-4, and 52.212-5, along with DFARS clauses including 252.211-7003, are incorporated by reference. Wide Area WorkFlow (WAWF) is required for payment and receiving reports. Packaging and marking instructions reference DODMANUAL 4140.01 and MIL-STD-129R. Duty-free entry is required.