USNS SALVOR (T-ARS 52) Mid-Term Availability (MTA)

SOL #: N6264926RL019Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

N/A, AX1

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 18, 2026
3
Submission Deadline
Jul 20, 2026, 2:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

NAVSUP Fleet Logistics Center Yokosuka (FLCY) Site Singapore has issued a competitive solicitation for the USNS SALVOR (T-ARS 52) Mid-Term Availability (MTA). This opportunity seeks contractors to perform repair and maintenance services on the vessel, with a hybrid Firm-Fixed Price (FFP) and Time and Material (T&M) contract anticipated. Proposals are due July 20, 2026, at 10:00 AM Singapore Time.

Scope of Work

The solicitation covers comprehensive repair and maintenance for the USNS SALVOR (T-ARS 52), as detailed in MSC Specification SSU 27-004 and the "Work Item Index Report." Key requirements include various ship repair labor and material handling rates for growth, new work, and T&M. Specific labor functions encompass abrasive cleaning/blasting, welding, carpentry, electrical work, pipefitting, and rigging. Support functions include testing, quality assurance, supervision, security, and program management. The work items are categorized and include annual inspection, preservation, renewal, repair, and service tasks across hull, propulsion, electrical, communication, auxiliary machinery, and habitability systems.

Contract & Timeline

  • Contract Type: Hybrid Firm-Fixed-Price (FFP) and Time and Material (T&M) CLINs.
  • Period of Performance: April 21, 2027 – June 19, 2027 (Base), with an option period from June 20, 2027 – July 4, 2027.
  • Place of Performance: Contractor’s facility within the U.S. 7th Fleet Area of Responsibility (AOR), excluding India.
  • Set-Aside: If offers from two or more responsible U.S. small businesses are competitive, offers from other than small businesses will not be considered for award (Total Small Business Set-Aside).
  • Proposal Due Date: July 20, 2026, at 10:00 AM Singapore Time.
  • Published Date: June 18, 2026.

Evaluation

Award will be based on Lowest Total Price and Technical factors. Technical factors include: (1) Understanding the Work Package (TPSN, Problem Areas, Engineering, Material Availability, Material Control and Storage, Heavy Weather Plans, Fire and Flooding Protection Plans); (2) Ability to Perform the WI Package (Man-hour Chart, Growth Absorption, Facilities, Berth/Approach/Mooring, Certifications); and (3) Management Control and Quality Assurance (Organization/Personnel, Subcontractor Participation, Quality Control Plan, Hazardous Waste Management Plan). Past Performance will be evaluated on an Acceptable/Unacceptable basis.

Additional Notes

Prospective offerors must maintain an active registration in SAM.gov. Section J attachments and specification references will not be publicly posted; interested parties must contact the Points of Contact (POC) to coordinate secure transmittal via DoD SAFE. This request must be submitted no later than June 25, 2026, at 10:00 AM Singapore Time, and must include the company’s Unique Entity Identifier (UEI). Offerors are responsible for monitoring SAM.gov for amendments.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Jun 18, 2026
Version 1
Pre-Solicitation
Posted: May 6, 2026
View
USNS SALVOR (T-ARS 52) Mid-Term Availability (MTA) | GovScope