USP Lee - Replace Cooling Towers
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Bureau of Prisons (FBOP), USP Lee County in Pennington Gap, VA, is soliciting proposals for the replacement of two critical, failing cooling towers. This Combined Synopsis/Solicitation seeks a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals. The project is designated as a Total Small Business Set-Aside. Proposals are due by April 2, 2026, at 4:00 PM US/Eastern.
Scope of Work
The contractor will be responsible for the total replacement of two institutional cooling towers located in the Central Utility Building (CUB) at USP Lee. This includes providing all necessary labor, parts, delivery, removal, disposal, installation, startup, and training of staff. The new cooling towers must comply with approved specifications, and the scope also covers the removal, disposal, replacement, and installation of associated access ladders, handrails, and platforms. All work must adhere to Federal, State, and Local building codes, environmental regulations, and manufacturer's warranty requirements. Installers must be manufacturer-certified, and the contractor must have a minimum of three years of documented experience on similar projects.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (single award).
- Set-Aside: Total Small Business.
- Magnitude: Estimated between $250,000.00 and $500,000.00.
- Performance Period: Work shall commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 161 calendar days.
- Bonds: A Bid Bond (SF24) is required (20% of bid price, not to exceed $3,000,000.00, not required for bids of $150,000 or less). Performance and Payment Bonds are required for contracts over $150,000, with penal sums of 100% of the original contract price.
- Wage Rates: Subject to Department of Labor Wage Determination VA20260009 for building construction in Lee County, VA.
Submission & Evaluation
- Evaluation Method: Lowest Price Technically Acceptable (LPTA) in accordance with FAR 15.101-2.
- Submission Requirements: Offerors must submit three clearly separated items:
- Completed SF1442 (solicitation) with specified blocks filled in, including the amount.
- Completed SF24 Bid Bond (emailed, with visible seal).
- A summary of the technical process for completing the work as per the Statement of Work.
- Submission Deadline: April 2, 2026, at 4:00 PM US/Eastern.
- Submission Email: rcalandra@bop.gov.
- Pre-bid Site Visit: A site visit is scheduled for March 18, 2026, at 10:00 AM at FCI Lee - Front Lobby, Pennington Gap, VA. Email lee-facilities-s@bop.gov for further information. Unlimited representatives may attend, and no NCIC clearances are needed.
- Security Requirements: Contractor personnel will be subject to background checks (HSPD-12), vehicle/pedestrian searches, and restrictions on personal electronic devices. No contact with inmates is permitted.
Contact Information
- Primary Contact: Ronald Calandra, rcalandra@bop.gov, 843-3287-9424.