USS BATAAN FY24 DSRA RCC 1615N

SOL #: N50054_26003JustificationSole Source

Overview

Buyer

Dept Of Defense
Dept Of The Navy
MID ATLANTIC REG MAINT CTR
NORFOLK, VA, 23511-2124, United States

Place of Performance

Norfolk, VA

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 20, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically the Mid-Atlantic Regional Maintenance Center (MARMC), has issued a Justification for Other Than Full and Open Competition for work on the USS BATAAN (LHD5). This action justifies the procurement of NCDS FCU installation and INVOKE (RCC 1615N) services. The work is critical and must commence immediately to integrate into the existing complex work package. The estimated value is redacted, and the work is funded by Fiscal Year 2025 Other Procurement, Navy (OPN) funds.

Scope of Work

The procurement covers the installation of NCDS FCU and INVOKE (RCC 1615N) on the USS BATAAN (LHD5), in accordance with Specification Item 980-11-008. This work is essential for the ship's maintenance and operational readiness.

Contract & Timeline

  • Type: Justification for Other Than Full and Open Competition (implies limited competition/sole source)
  • Funding: Fiscal Year 2025 Other Procurement, Navy (OPN)
  • Set-Aside: None specified (Justification for limited competition)
  • Published: February 20, 2026
  • Work Commencement: Must commence no later than a redacted date to allow integration into the Prime Contractor's work package.

Justification & Rationale

This Justification and Approval (J&A) cites "Unusual and Compelling Urgency" as the statutory authority for using other than full and open competition. The immediate need for the NCDS FCU installation and INVOKE (RCC 1615N) is driven by the requirement to integrate this work into the USS BATAAN's existing large and complex work package without delay. Due to the critical nature and immediate need, market research was not conducted. The Contracting Officer has determined the anticipated cost to be fair and reasonable.

Place of Performance

Norfolk, VA, United States

Contact Information

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Feb 20, 2026