USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

SOL #: N5523626R0009Sources Sought

Overview

Buyer

Dept Of Defense
Dept Of The Navy
SOUTHWEST REGIONAL MAINT CENTER
SAN DIEGO, CA, 92136-5205, United States

Place of Performance

Place of performance not available

NAICS

Other Engine Equipment Manufacturing (333618)

PSC

Diesel Engines And Components (2815)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 30, 2026
2
Response Deadline
May 8, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Southwest Regional Maintenance Center (SWRMC) is conducting market research via a Sources Sought notice to identify industry capability for providing one (1) turnkey ALCO Model 251C engine to support the USS BOXER (LHD-4). This requirement is for the upcoming FY27 Selected Restricted Availability (SRA). Responses are due May 8, 2026.

Scope of Work

This effort seeks Original Equipment Manufacturer (OEM) direct procurement of a single turnkey ALCO Model 251C engine. The engine is required to support the USS BOXER (LHD-4)'s FY27 SRA, with a required delivery date of February 15, 2027, or best available. The contemplated contract type is a Firm Fixed Price.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • NAICS: 333618 - Other Engine Equipment Manufacturing (Small business size standard: 1,500 employees)
  • Set-Aside: None specified; SWRMC is specifically interested in determining small business capability and interest.
  • Response Due: May 8, 2026, 2:00 PM local time, San Diego, CA
  • Published: April 30, 2026

Evaluation

This is a market research effort to gather information from the marketplace and identify potential sources. Responses will be used to determine industry's capability, particularly small businesses, to meet the requirement. This notice is not a request for proposal, and information provided will not be considered an offer or form a binding contract.

Additional Notes

Interested companies must submit a letter of interest on company letterhead via email to Mira Brown (miramaje.c.brown.civ@us.navy.mil) and Kristin Liljestrom (kristin.j.liljestrom.civ@us.navy.mil). The subject line should be "USS BOXER (LHD-4), #2 Emergency Diesel Generator (EDG) Overhaul Sources Sought Notice". The letter should include a brief company description, ability to provide OEM materials by the required delivery date, and answers to specific questions regarding business size (small/large, specific small business categories) and authorization as a Fairbanks Morse Defense distributor. Responses are limited to five (5) pages. No telephone inquiries will be accepted.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Sources Sought
Posted: Apr 30, 2026
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | GovScope