USS HARTFORD (SSN 768) Engineered Overhaul
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
General Dynamics Electric Boat, Groton, Connecticut, was awarded a cost-plus-incentive-fee (CPIF) modification to a previously awarded contract N00024-20-C-4312 for the engineered overhaul (EOH) of the USS HARTFORD (SSN 768). Work will be performed in Groton, Connecticut, and is expected to be completed by November 2027.
This contract modification was awarded as a CPIF contract type in accordance with FAR 16.405-1(b), which states a CPIF contract is appropriate when a cost reimbursement contract is necessary and a target cost and fee adjustment formula can be negotiated that are likely to motivate the contractor to manage effectively.
This contract action was not awarded competitively. This contract was awarded on a sole source basis pursuant to the authority of 10 U.S.C. 2304(c)(3), to maintain a facility, producer, manufacturer, or other supplier available for furnishing property or services in case of a national emergency or to achieve industrial mobilization.
The information contained in the announcement is unclassified.