USS O'KANE FY26 DSRA RCC 13N
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically the SOUTHWEST REGIONAL MAINT CENTER, has issued a Special Notice in the form of a Justification and Approval (J&A) for other than full and open competition. This J&A seeks to add a New Work item to an existing firm-fixed-price contract (N0002425C4406) with BAE Systems San Diego for the USS O'KANE (DDG 77) Fiscal Year 2026 (FY26) Docking Selected Restricted Availability (DSRA). The action addresses the "980-90-026 Uptake Exhaust and Plenum Ablative Upgrade." The response date for this notice is April 30, 2026.
Scope of Work
This J&A covers the 980-90-026 Uptake Exhaust and Plenum Ablative Upgrade. The upgrade involves enhancing the ablative material within the Forward and Aft MK 41 Vertical Launching System (VLS) to safely accommodate the MK 72 boosted missile. Failure to perform this upgrade could compromise equipment readiness, capability, and warfighting ability, with a potential risk of catastrophic failure. Additionally, temporary support services, including clean dry air, electrical connections, lighting, and ventilation, are required from January 6, 2026, to May 21, 2026, to support the Alteration Installation Team (AIT).
Contract Details
- Existing Contract: N0002425C4406, a firm-fixed-price contract awarded to BAE Systems San Diego.
- Period of Performance (Support Services): January 6, 2026, to May 21, 2026.
- Funding: FY26 OMN (NAVSEA funded).
- Place of Performance: San Diego, CA.
Competition & Rationale
This action is justified for other than full and open competition under 10 U.S.C. 3204(a)(1) and FAR 6.302-1, citing that BAE Systems San Diego is the only responsible source. Competitive solicitation is deemed unfeasible due to the work's duration and complexity, the need for a contractor experienced in long-term temporary services, and BAE's existing facility already housing the USS O'KANE (DDG 77) for its DSRA, which avoids additional rental costs. Limited market research was conducted due to the impracticality of another company performing simultaneously.
Eligibility / Set-Aside
Not applicable as this is a justification for other than full and open competition.
Additional Notes
The original contract was competitively awarded. This upgrade is an unanticipated event. A notice in accordance with FAR Subpart 5.2 will not be publicized based on FAR 5.202(a)(2). The Contracting Officer has determined the anticipated cost will be fair and reasonable.