USS Savannah (LCS-28) New Work RCC 4N
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / SOUTHWEST REGIONAL MAINT CENTER has issued a Sources Sought notice regarding an amendment for New Work RCC 4N on the USS Savannah (LCS-28). This amendment modifies the technical specifications for providing a Self Contained Breathing Apparatus (SCBA) Charging Station for the vessel, which was previously awarded to Vigor Marine LLC.
Scope of Change
This document, an amendment/modification, clarifies and updates the requirements for the provision of a Self Contained Breathing Apparatus (SCBA) Charging Station. Key changes include:
- Identification: Specifies one (1) Emergency Breathing Air Compressor (EBAC), Configuration 4, P/N 7246206-4, APL 06A130003, as detailed in referenced tables and manufacturer information.
- Requirements: Outlines the need for the provision of the EBAC for the duration of the availability period, daily visual inspections, submission of approved requirements, accomplishment of requirements per guidance, daily operational tests, verification of conformance, and training for Ship's Force on EBAC use and operation.
- Affected Sections: Sections 1 (Scope), 2 (References), and 3 (Requirements) of the original specification are impacted.
Contract & Timeline
- Opportunity Type: Sources Sought (Amendment/Modification to existing work)
- Set-Aside: None specified
- Place of Performance: Portland, OR, United States
- Published Date: May 15, 2026
- Response Date: May 19, 2026 (Note: The amendment itself indicates no changes to proposal deadlines or submission instructions).
Additional Notes
This notice pertains to an amendment for work on the USS Savannah (LCS-28), which was awarded to Vigor Marine LLC under Contract N00024-25-C-4420. The amendment focuses on technical requirements for the SCBA Charging Station and does not alter submission instructions or deadlines for any associated proposals. For inquiries, contact Preston Carlson at preston.a.carlson.civ@us.navy.mil or Carlos F. Quintero at carlos.f.quintero2.civ@us.navy.mil.