USS STOCKDALE (DDG-106) FY26 CMAV S001_1 Air Conditioning Plant Class B Overhaul; accomplish
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / Southwest Regional Maintenance Center (SWRMC) has issued a Justification for an Exception to Fair Opportunity for the Class B Overhaul of the Number 4 Air Conditioning (AC) Plant on the USS STOCKDALE (DDG-106). This critical work, identified as Work Item 514-20-002, is intended to be placed with Epsilon Systems Solutions, Inc. under MAC-IDIQ N00024-22-D-4454.
Scope of Work
The requirement is for a Class B Overhaul of the Number 4 AC Plant on the USS STOCKDALE (DDG-106). This overhaul is essential for the ship's operational capability, combat systems, and crew habitability, as the system's failure has led to reduced capabilities and poses a risk to crew safety.
Contract & Timeline
- Type: Justification for Exception to Fair Opportunity (JOFOC)
- Contract Vehicle: Multiple Award Contract (MAC-IDIQ) N00024-22-D-4454
- Intended Awardee: Epsilon Systems Solutions, Inc.
- Requirement: Class B Overhaul of Number 4 AC Plant
- Period of Performance: April 13, 2026 - May 22, 2026 (6 weeks)
- Funding: FY26 OPN D2
- Published Date: May 12, 2026
- Set-Aside: None (Non-competitive action)
Justification
The justification for this non-competitive action is based on the urgency of the need. The failure of the Number 4 AC Plant is critical, and a competitive solicitation process would result in unacceptable delays, preventing the ship from meeting its required delivery date. The combined timeline for competitive award would exceed the available window for the overhaul, which is estimated to take 6 weeks.
Contact Information
- Primary Contact: Paul Chase (paul.l.chase3.civ@us.navy.mil, 619-556-3083)
- Secondary Contact: James Benoit (james.p.benoit3.civ@us.navy.mil, 619-850-7715)