V250 AND TMS KIT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically W6QK ACC-RSA at Redstone Arsenal, AL, is soliciting for a V250 and Torque Measurement System (TMS) Kit. This procurement supports the Prototype Integration Facility (PIF) and the Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center, aiming to interoperate with a Variable-Geometry, Radial Outflow Compressor (VAROC) Air Dynamometer 250 and a T408 aircraft engine for Flexible Engine Diagnostics Systems (FEDS). Responses are due December 1, 2026.
Scope of Work
The requirement includes two main components:
- V250 / T408 Torque Measurement System Kit: The contractor shall provide a complete TMS kit, including the TMS module/shaft (with spline adapter and splined hub if necessary), TMS plumbing, a TMS calibration kit with weights, and electronics (signal processor, Rotastat Control, and a 90 ft. cable).
- V250 Application Study for the T408 Aircraft Engine: The contractor will evaluate the V250 Dynamometer for testing objectives and configuration needs related to the GE T408 Turboshaft Engine. This includes defining specific interphase requirements, considering test plans, inertia requirements, speeds, and power. Deliverables for this study include special rotor considerations for inertia, identification of appropriate torque measurement equipment (torque meter, interconnect shafts, electronics), and subsequent updates or generation of new drawings and documents.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Response Due: December 1, 2026, 23:00:00Z
- Published: November 17, 2025, 16:51:01Z
- Place of Performance: Redstone Arsenal, AL, United States
Evaluation
Evaluation criteria are not explicitly detailed in the provided information.
Additional Notes
Primary contact for this opportunity is Leighton Bragg at LEIGHTON.E.BRAGG.CIV@army.mil. A secondary contact is Al Condino at al.j.condino.civ@army.mil.