VALVE LINEAR DIRECT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the repair of VALVE LINEAR DIRECT. This opportunity will result in a bilateral award under Basic Ordering Agreement #N0010424GZ901, requiring contractor acceptance. Key requirements include Government Source Inspection (GSI) and adherence to strict 'Mercury Free' specifications. Responses are due by June 15, 2026.
Scope of Work
This contract covers the repair and quality requirements for the VALVE LINEAR DIRECT. Contractors must ensure repairs meet operational and functional requirements, adhering to their standard practices, manuals, and directives, including specific procedures like Sargent Controls and Aerospace submarine hydraulic valves procedure 11-000001, Rev K. Items must be marked in accordance with MIL-STD-130. A critical requirement is that all materials supplied must be 'Mercury Free' for use on submarines/surface ships, with strict prohibitions on mercury contamination.
Contract & Timeline
- Type: Solicitation (Bilateral Award under BOA #N0010424GZ901)
- Product Service Code: 4820 (Valves, Nonpowered)
- Set-Aside: None specified
- Response Due: June 15, 2026, 8:30 PM EDT
- Published: May 15, 2026, 8:40 AM EDT
- Freight: FOB Origin
Submission Requirements
Quotes must include the quote amount, Repair Turnaround Time (RTAT) in days, unit price, total price, and an informal cost breakdown if applicable. Offerors must also provide their Awardee CAGE, and if different, the Inspection & Acceptance CAGE and Facility/Subcontractor CAGE where the asset will be shipped. Verification of nomenclature, part number, and NSN is mandatory prior to responding.
Quality Assurance & Packaging
Contractors are responsible for all inspection requirements, performing tests according to original manufacturer's specifications and drawings. Records of inspection must be maintained for 365 days post-delivery. Packaging must comply with MIL-STD 2073.