VALVE,ASSEMBLY
SOL #: N0010426QYA8ZSolicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States
Place of Performance
Place of performance not available
NAICS
Other Metal Valve and Pipe Fitting Manufacturing (332919)
PSC
Valves, Nonpowered (4820)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
May 7, 2026
2
Submission Deadline
Jun 5, 2026, 8:30 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is a Solicitation from the Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH for the repair of VALVE,ASSEMBLY (PSC 4820). The resulting contract will be a bilateral award under Basic Ordering Agreement #N0010424GZ901. Quotes are due by June 5, 2026.
Scope of Work
The requirement is for the repair of VALVE,ASSEMBLY, specifically Cage Code 78062, Reference Number 20863-001. All repair work must adhere to the contractor's repair/overhaul standard practices, manuals, and directives. Key requirements include:
- Mercury-Free: Materials must be free from metallic mercury contamination, unless written approval is obtained for functional mercury parts.
- Marking: Items must be identified in accordance with MIL-STD-130, REV N.
- Design Changes: Specific procedures for reporting and obtaining approval for changes in design, material, servicing, or part numbers (Codes 1-6).
- Government Source Inspection (GSI): Required.
- FOB Origin: All freight is FOB Origin.
Contract & Timeline
- Type: Solicitation for Repair (bilateral award under BOA #N0010424GZ901)
- Set-Aside: None specified
- Response Due: June 5, 2026, 8:30 PM EDT
- Published: May 7, 2026
Submission Requirements
Quotes must include:
- Unit Price and Total Price.
- Repair Turnaround Time (RTAT) in days, measured from asset return to acceptance.
- Informal cost breakdown (if applicable).
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- Proof of being an authorized distributor of the original manufacturer, provided on company letterhead and signed by a responsible official.
Quality Assurance & Packaging
- Contractor is responsible for all inspection requirements and compliance.
- Records of inspection must be kept for 365 days post-delivery.
- Inspection and testing of repaired items must follow original manufacturer's specifications.
- Packaging shall be in accordance with MIL-STD 2073.
Contact Information
For inquiries, contact TYREESE.C.SMITH.CIV@US.NAVY.MIL or call 717-605-5937.
People
Points of Contact
TYREESE.C.SMITH.CIV@US.NAVY.MILPRIMARY
Files
Files
Versions
Version 1Viewing
Solicitation
Posted: May 7, 2026