VALVE,FLOW CONTROL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the repair of VALVE,FLOW CONTROL (Product Service Code 4820). This is a Full and Open solicitation, issued under Emergency Acquisition Authority (EAA), encouraging accelerated delivery. The resultant award will be a Firm-Fixed-Price contract. Quotes are due by March 2, 2026.
Scope of Work
This opportunity requires the repair of VALVE,FLOW CONTROL (CAGE 52374, Ref. No. 01-435-0189-5). Repairs must meet operational and functional requirements, adhering to the contractor's standard practices, manuals, and approved technical procedures. The Government is seeking a Repair Turnaround Time (RTAT) of 322 days, with accelerated delivery encouraged. Government Source Inspection (GSI) is required.
Contract & Timeline
- Type: Firm-Fixed-Price (bilateral award)
- Set-Aside: Full and Open (previously Total Small Business, now dissolved by amendment)
- Response Due: March 2, 2026, 8:30 PM EST
- Published: February 5, 2026
Key Requirements & Pricing
Offerors must provide a quote including unit price, total price, and their proposed Repair Turnaround Time (RTAT). If the proposed RTAT exceeds the Government's 322-day requirement, capacity constraints must be detailed. Quotes must also specify a price reduction amount per unit per month for unexcusable delays in meeting the RTAT, up to a maximum. A Test & Evaluation (T&E) fee/price for items determined Beyond Repair (BR/BER) should also be included. All pricing is firm and should account for material in unwhole condition, missing hardware, or damage.
Additional Notes
This solicitation includes an option for increased quantity. Freight is FOB Origin but handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work. Contractors are responsible for quality assurance and maintaining inspection records for 365 days post-delivery. Changes in design, material, or part number require Contracting Officer approval, with specific codes for different types of changes.