VALVE,PRESSURE REDU
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting quotes for the repair of VALVE,PRESSURE REDU (PSC 4820). This Request for Quote (RFQ) requires a Repair Turnaround Time (RTAT) of 180 days and includes a price reduction clause for unexcusable delays. Responses are due by April 16, 2026.
Scope of Work
This opportunity covers the repair of VALVE,PRESSURE REDU, ensuring they meet operational and functional requirements as represented by CAGE Code 99657, Ref. No. RV77F-002-5. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings and technical orders. Items must be marked in accordance with MIL-STD-130, REV N. Contractors are responsible for all inspection and testing requirements as per original manufacturer specifications and drawings. Government Source Inspection (GSI) is required.
Contract & Timeline
- Type: Solicitation (RFQ for repair services)
- Set-Aside: None specified
- Response Due: April 16, 2026, 8:30 PM EDT
- Published: April 1, 2026
- Delivery: Accelerated delivery is encouraged. All freight is FOB Origin.
- Key Terms: 180-day RTAT, price reduction for unexcusable delays, Government Source Inspection (GSI).
Submission Requirements
Quotes must include:
- Unit Price and Total Price
- Proposed Repair Turnaround Time (RTAT) in days
- If not meeting the 180-day RTAT, provide capacity constraints
- Testing and Evaluation (T&E) fee/price if an asset is determined Beyond Repair (BR/BER), not to exceed a specified amount.
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
- Important: Only authorized distributors of the original manufacturer's item will be considered. Proof of authorized distributorship on company letterhead is required with the offer.
Additional Notes
Offerors must verify nomenclature, part number, and NSN prior to responding. Freight is handled by Navy CAV or Proxy CAV. The resultant award will be issued bilaterally, requiring contractor's written acceptance.