VALVE,RELIEF,PRESSU
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Solicitation Amendment from the Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is for the procurement of VALVE,RELIEF,PRESSU. The purpose of this amendment is to update clauses and dissolve the Small Business Set-Aside. This procurement requires the manufacture and design of specific relief valves according to the manufacturer THE ELECTRICE HEATER COMPANY (CAGE 19857), part number 340X-8.
Scope of Work
The contractor shall manufacture and design VALVE,RELIEF,PRESSU in accordance with the ordering data and contract requirements. Key specifications include:
- Manufacturer: THE ELECTRICE HEATER COMPANY (CAGE 19857)
- Part Number: 340X-8
- Technical Documents: No drawings or technical data are associated; the part number is fully descriptive.
- Mercury Exclusion: Mercury or mercury-containing compounds shall not be intentionally added or come into direct contact with hardware.
Contract & Timeline
- Opportunity Type: Solicitation Amendment
- Set-Aside: None specified (Small Business Set-Aside dissolved by this amendment)
- Published: May 4, 2026
- Response Date: Refer to solicitation for current closing date (previous response date was April 15, 2026, but this amendment was published later). Pricing is valid for 60 days after the closing date.
Quality Assurance & Packaging
- Quality Assurance: Contractor must provide and maintain an inspection system acceptable to the Government.
- Packaging: MIL-STD 2073 applies. Packaging labels must be marked with "VALVE, RELIEF T&P".
Additional Notes
This amendment updates various clauses. In case of conflict, Section "C" takes precedence over Section "D". An order of precedence for document conflict resolution is provided, with amendments to the purchase order/contract taking highest precedence. Information on obtaining nuclear reactor publications, commercial specifications, and technical manuals is included. Contractors must comply with specified document revisions and obtain approval for deviations. Requests for waivers/deviations on critical contracts require detailed justification and technical data.