VALVE,SOLENOID
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP Weapon Systems Support Mech) is soliciting quotes for the repair of VALVE,SOLENOID (PSC 4820). This opportunity requires an authorized repair source and will result in a Firm-Fixed Price (FFP), Not-to-Exceed (NTE), or Estimated (EST) bilateral award. Quotes are due by February 12, 2026.
Scope of Work
This solicitation covers the repair of VALVE,SOLENOID, ensuring it meets operational and functional requirements per CAGE 59211, Ref. No. 78024-ANW. Repairs must adhere to the contractor's standard practices, manuals, and approved repair standards. Key requirements include MIL-STD Packaging, Government Source Inspection, FOB Source, and Commercial Asset Visibility (CAV) Reporting. Items must be marked in accordance with MIL-STD-130, REV N.
Contract & Timeline
- Type: Solicitation for Repair (FFP, NTE, or EST)
- Set-Aside: None specified
- Repair Turnaround Time (RTAT): 196 days after receipt of asset. A price reduction will be applied for failure to meet RTAT due to inexcusable contractor delay.
- Induction Expiration Date: 365 days after contract award.
- Quote Due: February 12, 2026, at 8:30 PM EST
- Published: January 13, 2026
Key Requirements & Submission
Offerors must be an authorized repair source and, if a distributor, provide proof of authorization on company letterhead. Quotes must be submitted electronically via email to taylor.r.arroyo2.civ@us.navy.mil and include:
- Repair unit price, total price, and proposed RTAT.
- New unit price and T&E fee/price (if asset is determined Beyond Repair/Economically Repairable).
- Relevant CAGE codes (Award, Inspection & Acceptance, Facility/Subcontractor, Packaging Facility).
- A throughput constraint (monthly repair capacity).
- Proposed price reduction amount for RTAT non-compliance.
- A quote expiration date (minimum 90 days).
Additional Notes
Contractor is responsible for all inspection requirements and maintaining records for 365 days post-delivery. MIL-STD 2073 packaging applies.