VALVE,SOLENOID
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, has issued a Solicitation for the repair of VALVE,SOLENOID (PSC 4810). This opportunity requires contractors to repair items to meet operational and functional requirements, with a focus on a Repair Turnaround Time (RTAT) of 180 days. Responses are due by April 13, 2026.
Scope of Work
This solicitation is for the repair of VALVE,SOLENOID, requiring adherence to specific Cage Code/Reference Number items and MIL-STD-130 for marking. All repair work must follow the contractor's standard practices, manuals, and directives. Key requirements include:
- Meeting operational and functional requirements for the VALVE,SOLENOID.
- Compliance with MIL-STD-130 for physical identification.
- Procedures for handling design, material, servicing, or part number changes, requiring Contracting Officer approval for most changes.
- Contractor responsibility for all inspection requirements and compliance, with Government Source Inspection (GSI) required.
- Packaging in accordance with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (for repair services)
- Set-Aside: None specified
- Response Due: April 13, 2026, 8:30 PM UTC
- Published: March 30, 2026
Key Requirements & Submission
The Government is seeking a Repair Turnaround Time (RTAT) of 180 days. A significant clause states that failure to meet the required RTAT will incur a price reduction per unit/per month, unless the delay is excusable. Offerors must propose a price reduction amount per unit per month for unexcusable delays, up to a maximum. Quotes must include:
- Unit Price and Total Price.
- Proposed Repair Turnaround Time (RTAT) in days.
- Explanation of capacity constraints if not meeting the 180-day RTAT.
- Details for Testing and Evaluation (T&E) if an asset is Beyond Repair (BR/BER), including a Not-to-Exceed (NTE) fee.
- Awardee and performance location CAGE codes.
- New unit price and delivery lead-time for comparison. Accelerated delivery is encouraged, and all freight is FOB Origin.
Additional Notes
Consideration for award will only be given to authorized distributors of the original manufacturer's item; proof of authorization must be submitted with the offer. Contractors are responsible for obtaining applicable documents referenced in the solicitation.