VARIOUS HONDA PARTS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) Surface Forces Logistics Center (SFLC) is seeking quotations for various HONDA PARTS to support "Operation River Wall" for vessels AB-SKF-16, CB-ATON-S, and CB-ATON-M-18. This is a Total Small Business Set-Aside combined synopsis/solicitation for a Firm Fixed Price Purchase Order. The requirement is for brand-name Honda parts, justified due to mission criticality and lack of technical data for alternatives. Quotations are due April 22, 2026.
Scope of Work
The procurement is for specific HONDA brand marine parts, deemed essential for the proper operation of Coast Guard assets. Key items include:
- Propellers, Marine (25 EA)
- Fuel Separators, Emission Control (10 EA)
- Oil Filters (100 EA)
- Spark Plugs (150 EA)
- Hydraulic Non-Vehicle Transmissions (10 EA)
- Handle Lever Controls (50 KT)
- Water Pump Impellers (50 EA)
- Outboard Motor Tilt Assemblies (25 EA)
- Engine Water Pump Parts Kits (50 KT)
- Gasoline Engine Starters (10 EA)
All items require individual packaging per MILSTD-2073-1E Method 10, with specific marking and barcoding requirements. While substitutions require a Specification Sheet for evaluation, any offered replacement parts must conform to the HONDA brand, as technical data for equal or alternate equipment is unavailable.
Contract Details
- Contract Type: Firm Fixed Price Purchase Order.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Payment Terms: NET 30, in accordance with FAR 52.232-25.
- Delivery: Required by February 23, 2026, FOB DESTINATION to U.S. Coast Guard Surface Forces Logistics Center, 2401 Hawkins Point Road, Receiving Room- BLDG 88, Baltimore, MD, 21226. Delivery hours are Monday through Friday, 7:00 AM to 1:00 PM.
- Place of Performance: Curtis Bay, MD 21226, United States.
Submission & Evaluation
- Submission: Vendors must submit a quotation. All vendors must have an active SAM.Gov registration or proof of submission for registration.
- Evaluation: Award will be based on Best Value, considering completeness of requirement, adherence to timeframe, and price.
- Invoicing: Must be processed through https://www.ipp.gov and include specific details (CG PO number, vendor invoice number, cage number, PO item number, description, unit/extended totals). Shipping costs should be a separate line item.
Additional Notes
This procurement is justified as a brand-name purchase under Simplified Acquisition Procedures (FAR 13.106-1(b)) due to the essential nature of HONDA parts for mission readiness. The Justification for Other Than Full and Open Competition (JOTFOC) highlights that non-HONDA parts without specific manufacturing data could lead to "major mission degradation."