Vendor Managed Inventory System (VMI) for Tool & Fixture - RIA JMTC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through ACC-RI, is conducting a Sources Sought to identify vendors capable of providing a Vendor Managed Inventory (VMI) System for Tool & Fixture hardware and steel at the Rock Island Arsenal – Joint Manufacturing and Technology Center (RIA-JMTC) in Rock Island, IL. This VMI system will optimize supply chain performance for the Tool Design division. Responses are due by May 22, 2026.
Scope of Work
The selected vendor will be responsible for purchasing and maintaining a minimum/maximum supply of specified items (detailed in Attachment 0001) at RIA-JMTC. This includes providing, installing, stocking, and maintaining vendor-supplied cabinets/bins/shelving, as well as stocking and maintaining designated Government-owned racks. The VMI system requires regular inventory reviews, removal of damaged/outdated goods, and restocking to predetermined levels. Operations are 24/7, excluding Federal Holidays or facility closures.
Performance Standards
Key performance standards include maintaining stock levels per Attachment 0001, 24-hour replenishment for depleted stock, and 12-hour response/24-hour on-site replenishment for emergency requests. The vendor must provide Weekly Stocking Reports (CDRL0001), Bi-Weekly Consumption Reports (CDRL0002), and a "Road Map" (CDRL0003) detailing item placement. Defective products must be replaced within 3 days.
Contract & Timeline
- Opportunity Type: Sources Sought
- Anticipated Contract Type: Indefinite Delivery / Indefinite Quantity (IDIQ)
- Anticipated Duration: Five (5) years from contract date, including a 60-day phase-in period.
- Set-Aside: None specified.
- Response Due: May 22, 2026, at 3:00 PM Z
- Published: May 14, 2026
- Place of Performance: Rock Island Arsenal – Joint Manufacturing and Technology Center (RIA-JMTC), 4th floor Bldg. 220, Rock Island, IL.
Submission Requirements
Interested vendors must submit a capability statement reflecting their ability to adhere to the Performance Work Statement (PWS). Pricing will NOT be accepted at this time, as Attachment 0001 is subject to revisions. The awardee must comply with the Buy American Act and related clauses.
Special Requirements
Compliance with RIA installation security requirements (background checks, RAMP, Anti-Terrorism Level I training) and safety regulations (OSHA, ASTM, PPE) is mandatory. Vending machines/cabinets must be functional, suitable for heavy usage, fit within a 20FT x 50FT room, and feature electronic access control and monitoring. Connectivity should use cellular modems or HTTPS/port 443, avoiding Government network switches. Invoicing will be via DFAS through Wide Area Workflow (WAWF) monthly. RIA-JMTC assumes ownership of items when taken from cabinets/racks.