VGLZ 242015 Repair HVAC B105
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The contractor shall schedule and perform a construction task for the replacement ofthe existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will providecomplete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heatexchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shallinclude but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startupand validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes fromthe existing configuration