Village Power Communication Line Re-Routing
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Sources Sought notice is for Village Power Communication Line Re-Routing in Campia Turzii, Romania. The objective is to relocate and reorganize the existing above-ground electrical and communication distribution network into an underground conduit system to improve reliability, safety, and maintainability. Responses are due by April 17, 2026.
Scope of Work
The contractor shall provide all labor, materials, equipment, and supervision to install four, Ø110 mm underground PVC conduits. This involves rerouting power and communication lines from the current above-ground cable tray system to a new underground network. Key tasks include:
- Excavating a 14-meter trench (80-90 cm deep, 45 cm wide) compliant with IEC 60364-5-52 and Romanian standards.
- Installing four Ø110 mm PVC conduits, ensuring they are empty, capped, and unobstructed, with drawstrings.
- Removing and disposing of previous conduit lines.
- Providing a 10 cm sand bedding layer, backfilling with 21 cm of sand and 37 cm of crushed aggregate, and installing warning tape.
- Restoring the surface with a 22 cm concrete slab matching adjacent surfaces.
- Implementing site protection, erosion control, and restoration measures, including filling a specific hole.
Contract & Timeline
- Type: Sources Sought / Market Research
- Period of Performance: 14 working days from Notice to Proceed (NTP).
- Set-Aside: None specified.
- Response Due: April 17, 2026, 12:00 PM Z.
- Published: April 13, 2026.
Requirements & Standards
All work must comply with NEC, IEEE, local utility standards, and site-specific requirements. The contractor is responsible for utility locating and avoidance. Performance standards include compaction testing, depth verification, and documentation. Work hours are 9 AM to 5 PM, with no concrete pouring during suspected storms. Daily progress logs and PDF reports are required.
Deliverables
- Underground routing plan and construction drawings.
- Material submittals and technical data sheets.
- As-built drawings showing conduit paths, depths, and cable identification.
Additional Notes
The contractor must provide all necessary tools, equipment, materials (including conduits and PPE), and waste disposal. USG and Romanian Air Force (RoAF) may provide access, coordination, review, and oversight, but no tools, materials, or labor unless specified. Security requirements include compliance with USG/RoAF protocols and 7-day advance base access requests. A comprehensive safety plan (OSHA-compliant) and a minimum 12-month warranty on workmanship and materials are mandatory.