Solicitation Notice: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is a Solicitation Notice for the Energy Resilience Conservation Investment Program (ERCIP) project at Lake City Army Ammunition Plant (LCAAP) in Independence, MO. The project involves the construction of a Microgrid and Combined Heat and Power (CHP) system. This is a Full and Open procurement with a HUBZone price evaluation preference. The estimated magnitude is between $25 million and $100 million, with an expectation to be at the upper end of this range. Proposals are due by June 12, 2026, at 5:00 PM Eastern.
Project Overview
The project entails the construction of a 15.0 MW CHP plant with two 7.5 MW dual-fuel combustion turbines, integration with existing electrical infrastructure, microgrid controls, installation of underground storage tanks, and connection to existing utility infrastructure. It also includes site improvements, demolition, air permitting, communications, cybersecurity, and full commissioning. A Justification and Approval document specifies the use of brand-name Schweitzer Electronic Laboratories (SEL) power system protection relays and controllers (estimated at $2.6 million) due to unique functionality and integration requirements, ensuring full and open competition at the prime contractor level.
Contract Details
- Contract Type: Firm Fixed-Price (FFP) construction contract.
- NAICS Code: 237130, Power and Communication Line and Related Structures Construction, with a $45,000,000 size standard.
- Set-Aside: Full and Open with a 10% HUBZone price evaluation preference.
- Period of Performance: 1014 calendar days after Notice to Proceed.
- Place of Performance: Lake City Army Ammunition Plant, Independence, MO.
Key Requirements & Accessing Documents
- CMMC Requirement: CMMC Level 2 (Self) is mandatory prior to award for the contractor and/or subcontractors processing FCI/CUI. Offerors must possess the required CMMC status posted in SPRS.
- Technical Package Access: The full solicitation, including drawings and specifications, contains Controlled Unclassified Information (CUI) and/or Federal Contract Information (FCI). To obtain access, firms must have an active SAM Registration and a current BASIC confidence level in SPRS. Access requests must be emailed to Alexa Dukes (alexa.l.dukes@usace.army.mil) and Travis Dunn (travis.i.dunn@usace.army.mil) with CAGE Code and UEI, confirming SPRS BASIC confidence.
- Joint Ventures: For joint ventures, information for each member must be submitted within the Evaluation Criteria, Paragraph 8.4.1 "Submission Requirements."
Submission & Evaluation
- Proposal Due Date: June 12, 2026, at 5:00 PM Eastern.
- Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
- Evaluation: Award will be made using a Best Value Trade-Off process, where evaluation factors (other than price) are considered approximately equal to price.
- Inquiries: Bidder inquiries should be submitted through ProjNet, as detailed in the solicitation under "Offeror's Questions and Comments."
Important Notes
- An Official Site Visit Report and Attendee List are available from the site visit held on April 29, 2026.
- Wage Decisions MO20260001 and MO20260082 (both dated May 18, 2026) have been updated.
- Metal-clad MV switchgear (IEEE C37.20.2) is an acceptable deviation to specified IEEE C37.20.3 metal-enclosed switchgear, provided dimensions and weights do not exceed baseline design and all associated costs are included in the base bid.