Virtual Industry Day: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, Louisville District Office, hosted a Virtual Industry Day for the Lake City Army Ammunition Plant (LCAAP) Microgrid and Combined Heat and Power (CHP) Construction Project. This notice provides updates, including Q&A documents and Industry Day slides, for the upcoming Design-Bid-Build solicitation, W912QR26RA041.
Purpose of Industry Day
The virtual event, held on March 5, 2026, aimed to inform potential bidders about the project scope, procurement process, and technical requirements. The government has since posted Q&A responses and the Industry Day presentation slides.
Project Scope
The project involves the Design-Bid-Build construction of a 15 MW CHP microgrid system. This includes two 7.5 MW dual-fuel combustion turbines (natural gas and propane), heat recovery steam generators, a black start diesel generator, and all necessary electrical distribution equipment and microgrid controls. The system will operate in parallel with the existing utility, island mode, and black start mode, integrating with existing substations for seamless operation and load shedding. The project also covers piping, environmental controls (low NOx turbines), backup fuel storage, site improvements, demolition, air permitting, communications, cybersecurity, and full commissioning. The NAICS code is 237130 - Power and Communication Line and Related Structures Construction.
Procurement Details
- Contract Type: Design-Bid-Build
- Estimated Magnitude: $25,000,000 to $100,000,000
- Period of Performance: 1,014 calendar days
- Anticipated Advertisement: March 2026
- Anticipated Award: July/August 2026
- Set-Aside: Full and Open competition with a HUBZone price evaluation preference.
- Award Basis: Single-Phase "Best Value Trade-off"
- Solicitation Number: W912QR26RA041 (revised from W912QR26RA036)
- DPAS Rating: The awarded contract will include a DO-C2 rated order.
- Project Labor Agreement (PLA): Applicability is currently under review.
Key Requirements & Clarifications
- CMMC Level 2: Offerors must have a current CMMC Level 2 self-certification verified in the SPRS prior to accessing the CUI Technical Package and at the time of proposal submission. This must be maintained throughout the contract.
- PIEE Access: Registration in the Procurement Integrated Enterprise Environment (PIEE) is required to access the solicitation package and submit proposals electronically.
- Evaluation Criteria: Includes Volume I (Past Performance, Technical Approach, Small Business Participation Plan) and Volume II (Price and Pro Forma Information).
- Small Business Participation: A Small Business Participation Plan is a rated evaluation factor. Large businesses must also submit a Subcontracting Plan.
- Environmental Compliance: Bidders must adhere to "Environmental Review & Waste Management Instructions" for excavation, including specific procedures for soil abatement, disposal, and sampling at LCAAP.
- Bid Due Date: The government acknowledges feedback regarding the tight bid due date and will consider the complexity of proposal preparation. Any changes will be communicated via amendment.
Action Items
Review the posted Q&A documents and Industry Day slides for comprehensive project details. For questions, contact Alexa Dukes at alexa.l.dukes@usace.army.mil.