Francis E. Walter Dam Service Bridge Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract to perform repair work of the Francis E Walter Dam located in White Haven, PA. The major items of work to be performed under the Base Bid include, but are not limited to the following: resetting rocker bearings at Pier 2, repairing bearing anchor bolts at Pier 1, lubricating all bearing pins, repairing concrete areas with spalling or delamination, and installing an epoxy overlay on the bridge deck. The Period of Performance is 180 calendar days. Work on the project is anticipated to begin 10 calendar days after contract award and completed 180 calendar days after commencement of work