W912DY26RA032

SOL #: W912DY26RA032Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2V6 USA ENG SPT CTR HUNTSVIL
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Other Environmental Services, Studies, And Analytical Support (F999)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Jan 28, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 18, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Army Corps of Engineers Engineering and Support Center, Huntsville, on behalf of the Veteran's Administration, is soliciting proposals for Pre-Demolition Surveys at the Veteran's Medical Center facility in Palo Alto, California. This opportunity is a Women-Owned Small Business (WOSB) Program Set-Aside. Proposals are due by February 18, 2026, at 3:00 PM ET.

Scope of Work

The contract's purpose is to procure pre-demolition surveys for Building 54, identified as excess to the center's needs. The objective is to plan and complete environmental sampling to determine the presence of Asbestos Containing Materials (ACM) and Other Regulated Materials (ORM). This includes a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP), and PCBs-in-paint for potentially painted components.

The contractor shall quantify environmental contamination and propose methods for its safe removal and disposal. All sampling and recommendations must adhere to Federal, State, and local regulations. Laboratory testing and analysis are required within 35 workdays of site sampling completion. A Pre-Demolition Assessment Report must be submitted within 15 workdays of receiving sample results. The survey must be comprehensive, covering the facility exterior, roof, basement/crawl spaces, and the report must detail any inaccessible areas, their size, and previous use.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
  • Product Service Code: F999 - Other Environmental Services, Studies, And Analytical Support
  • Proposal Due: February 18, 2026, 3:00 PM ET
  • Published: February 12, 2026

Additional Information

Refer to the Performance Work Statement (PWS) and attached documents for specific requirements. Primary Contact: Benjamin Hoell, benjamin.g.hoell@usace.army.mil, 256-895-1935.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4
Solicitation
Posted: Feb 17, 2026
View
Version 3
Solicitation
Posted: Feb 13, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 12, 2026
Version 1
Solicitation
Posted: Jan 28, 2026
View
W912DY26RA032 | GovScope