WA-FWS TURNBULL NWR-STORAGE TANK CLEANUP

SOL #: 140FC326Q0032Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 3
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Remediation Services (562910)

PSC

Demolition Of Structures Or Facilities (Other Than Buildings) (P500)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 10, 2026
2
Submission Deadline
Jul 9, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Fish and Wildlife Service (FWS) is soliciting proposals for a Firm Fixed Price Construction contract to decommission two underground fuel storage tanks (USTs) at Turnbull National Wildlife Refuge in Cheney, Washington. This opportunity is a Total Small Business Set-Aside. Proposals are due by July 8, 2026, 5:00 PM PDT.

Scope of Work

The project involves the abatement, cleaning, and disposal of waste contents from two non-regulated USTs, which includes pumping, purging, cutting, and cleaning. Key tasks also encompass obtaining necessary county and confined space permits, conducting analytic testing of soil samples collected underneath each tank, and preparing a Non-Regulated Tank Report. An optional task covers the removal and disposal of the cleaned USTs. All work must comply with Spokane County Code and WA DOE regulations (173-360A WAC).

Contract Details

  • Contract Type: Firm Fixed Price Construction
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Period of Performance: Approximately June 22, 2026, to October 30, 2026. Work must commence within 15 calendar days after award or notice to proceed and be completed within 130 calendar days.
  • Bonds: Performance and Payment Bonds are required.
  • Wage Determination: General Decision Number WA20260130 for prevailing wage rates is applicable.

Submission & Evaluation

  • Proposal Submission Deadline: July 8, 2026, 5:00 PM PDT.
  • Submission Method: Electronic submission via email to Cindy_Salazar@ios.doi.gov.
  • Required Submittals: Technical Capability (two similar projects completed within the last five years), Past Performance (customer points of contact for cited projects), and a completed Quote Schedule (Section B).
  • Evaluation Factors: Technical Capability, Past Performance, and Price. Award will be made on a best-value basis.

Additional Notes

  • Request for Information (RFI) Deadline: June 26, 2026, 5:00 PM PDT.
  • A site visit is not available; interested parties should contact Turnbull NWR directly to request one.
  • The contractor must be WA DOE qualified and licensed, and responsible for all applicable notifications and permitting requirements.

People

Points of Contact

Salazar, CindyPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jun 10, 2026
WA-FWS TURNBULL NWR-STORAGE TANK CLEANUP | GovScope