WA NP OLYM 115(1), Repair Storm Damage on Mora Road

SOL #: 690567-25-SS-0008Sources Sought

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Forks, WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
May 27, 2025
2
Last Updated
May 27, 2025
3
Response Deadline
Jun 27, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Source Sought:

WA NP OLYM 115(1), Repair Storm Damage on Mora Road

This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Final plans and specifications are not available at this time. Responses to
this Sources Sought must be received by email no later than the date specified in the response section. This intent of this sources sought is for market research to determine contractors with the necessary experience and resources capable of performing this work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition.

REQUIREMENT:
NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.

Estimated Price Range: $2 - $5 Million

Project Location and Type of Work:

The proposed contract action is for a firm-fixed-priced construction contract. This project is to repair storm damage on mora road. This project is located at MP 1.25, between James Pond and Rialto Beach along Mora Road. The site is approximately 15 miles west of Forks, WA. The purpose of the project is twofold: 1) remediate issues related to erosion and access that have been damaged by major floods and on‐going channel migration of the Quillayute River and 2) reestablish and, and where feasible, improve fish habitat.

Additional Project Details:

The estimated period of performance will begin with an anticipated award in Winter 2025 and a fixed completion in December 2026

See attachment for full requirments

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download

Versions

Version 2
Sources Sought
Posted: May 27, 2025
View
Version 1Viewing
Sources Sought
Posted: May 27, 2025
WA NP OLYM 115(1), Repair Storm Damage on Mora Road | GovScope