WA SPRING CREEK -LAGOON PUMP PROJECT

SOL #: 140FS126Q0114Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, SAT TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Fluid Power Pump and Motor Manufacturing (333996)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Pumps And Compressors (J043)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 8, 2026
2
Submission Deadline
Jun 23, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for the WA Spring Creek - Lagoon Pump Project. This Total Small Business Set-Aside opportunity involves the maintenance, repair, and rebuilding of critical pumps at the Spring Creek National Fish Hatchery in Underwood, WA. The project aims to ensure the operational integrity of the pollution abatement lagoon pumps. Proposals are due June 22, 2026, by 5:00 PM Pacific Time.

Scope of Work

This solicitation requires the repair of one 50HP vertical pump assembly and motor, and the service of two additional 50HP pump assemblies and motors. Key tasks include:

  • Removal, teardown, inspection, and re-bushing of packing housing.
  • 2-stage bowl repair and shaft repair.
  • Motor repair, reinstallation of pump assemblies and motors, and performance of start-up procedures.
  • Removal and disposal of all waste material. Technical Exhibit 2 provides details on existing motor and pump specifications.

Contract & Timeline

  • Contract Type: Firm-fixed-price.
  • Period of Performance: Anticipated within 90 days from contract award, with specific work items scheduled from June 15, 2026, to August 8, 2026.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 333996, with a size standard of 1,250 employees.
  • Proposal Due: June 22, 2026, by 5:00 PM Pacific Time.
  • Published Date: June 8, 2026.

Evaluation

Award will be made using a Trade-off Method. The most advantageous quote will be selected based on price and other factors considered approximately equally: (i) technical capability and (ii) past performance (specifically, no record of terminations for default).

Additional Notes

Offerors must possess an ACTIVE registration in the System for Award Management (SAM) by the quote due date. Applicable FAR clauses, including 52.212-1, 52.212-3, and 52.212-4, are incorporated by reference, and FAR 52.212-5 is attached.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Solicitation
Posted: Jun 8, 2026
WA SPRING CREEK -LAGOON PUMP PROJECT | GovScope