Water Quality Management ASHRAE Plans

SOL #: 47PH5326N0002Sources Sought

Overview

Buyer

General Services Administration
Public Buildings Service
PBS CENTRALIZED ACQUISITION SERVICES - CUSTOMER CONTRACTING BRANCH A
Washington, DC, 20405, United States

Place of Performance

Place of performance not available

NAICS

All Other Miscellaneous Chemical Product and Preparation Manufacturing (325998)

PSC

Other Quality Control, Testing And Inspection Services: Water Purification And Sewage Treatment Equipment (H946)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 28, 2026
2
Response Deadline
May 11, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service (PBS), is conducting market research through a Sources Sought / Request for Information (RFI) to identify qualified contractors for developing Water Management Plans (WMPs) for 180 buildings nationwide. These WMPs must comply with ASHRAE Standard 188 and Guideline 12. Responses are due by May 11, 2026, at 4:00 PM EST.

Purpose & Scope

GSA seeks to procure services for the development of comprehensive Water Management Plans (WMPs) to manage building water systems, maintain water safety, and prevent stagnation-related issues. The WMPs must meet the minimum legionellosis risk management requirements outlined in ASHRAE Standard 188 and Guideline 12. Key activities include monitoring, testing, and maintenance of water systems, such as testing chlorine levels and temperature at point-of-use outlets, cleaning and changing aerators and showerheads, and validation testing of equipment. Remedial actions like flushing are not considered routine water safety tasks. The WMP must also adhere to GSA Order PBS 1000.7B, AIHA Recognition, Evaluation, and Control of Legionella in Building Water Systems, and CDC guidance.

Submission Requirements

Respondents must submit their information via email to kalish.poole@gsa.gov and diana.weiss@gsa.gov by 4:00 PM EST on May 11, 2026. Submissions should include a cover sheet with company details and numerical responses to the RFI questionnaire. The questionnaire asks for:

  1. Experience developing ASHRAE Standard 188 2021 compliant WMPs.
  2. Specific experience with commercial/high-rise building types.
  3. Resumes of team members, including experts in water treatment, engineering, and microbiology.
  4. Technical certifications (e.g., ASSE, sanitary engineer).
  5. Comfort level using a provided GSA template for report submittal.
  6. Years of relevant experience.

Important Notes

This RFI is solely for market research and acquisition planning purposes. It does not constitute a solicitation or a request for proposal, and no contract will be awarded based on responses. The Government will not reimburse respondents for any expenses incurred. The information gathered will help GSA understand acquisition strategy, contract type, scheduling, feasibility, and potential delivery vehicles.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Set-Aside: None specified (market research stage)
  • Response Due: May 11, 2026, 4:00 PM EST
  • Published: April 28, 2026
  • Product/Service Code: H946 - Other Quality Control, Testing And Inspection Services: Water Purification And Sewage Treatment Equipment

People

Points of Contact

Kalish PoolePRIMARY
Diana WeissSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: Apr 28, 2026
Water Quality Management ASHRAE Plans | GovScope