Water Treatment Facility
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for Water Treatment Facility improvements at the Monument Fire Center, Monument, Colorado. This project aims to ensure compliance with Colorado Department of Public Health and Environment (CDPHE) regulations by implementing Optimal Corrosion Control Treatment (OCCT) to address soluble lead in the well water. This is a Total Small Business Set-Aside. Proposals are due by April 22, 2026, at 5:00 PM Z.
Project Overview
The contractor will provide all labor, equipment, and materials to complete necessary improvements to the existing water treatment facility. The primary objective is to upgrade the facility to supply potable drinking water to fire center staff and achieve regulatory compliance regarding lead contamination.
Scope of Work
Key tasks include:
- Installation of new and relocated treatment process equipment, such as filter housings, baffle tanks, chemical feed pumps, process monitoring instrumentation, and associated valves and piping.
- Installation of all electrical wiring, HVAC, and piping, along with associated site work.
- Demolition of the existing water treatment building after components are relocated.
- Provision of all labor, materials, equipment, utilities, and freight for installation.
- Mobilization, project management, and quality control.
- Provision of temporary toilet facilities and trash abatement.
- The Government will furnish the new water treatment building (installed by a separate project) and provide site water and electricity for construction purposes.
Contract Details
- Contract Type: Firm Fixed-Price (Combined Synopsis/Solicitation - RFQ).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 236220 (Construction Of Miscellaneous Buildings) with a $45M size standard.
- Period of Performance: From date of award through September 30, 2026. The new water treatment building is anticipated to be completed by April 30, 2026.
- Wage Determination: Davis-Bacon Act prevailing wage rates apply for El Paso County, Colorado.
Submission & Evaluation
Quotations must include separate technical and price volumes and adhere to specific formatting requirements. Award will be made to the quoter representing the best value to the Government, considering both non-price and price factors. An acceptable technical rating is required. The Government may award to other than the lowest-priced quotation. Proposals must hold prices firm for 90 calendar days.
Key Dates & Contacts
- Proposal Due Date: April 22, 2026, at 5:00 PM Z.
- Anticipated Award: Within 90 days of proposal submission.
- Contact: Crystal Amos, crystal.amos@usda.gov, 618-467-8347.
Clarifications & Notes
- A temporary shutdown of the system is anticipated; the contractor will determine the duration.
- Normal work hours are Monday-Friday, 0700-1800; work outside these hours requires prior written approval.
- One virtual pre-work meeting is anticipated, with on-site meetings accommodated upon request.
- The completion date of September 30, 2026, remains firm.
- The contractor is responsible for providing new chemical injection and pH sensors, and pressure transmitter connections.