Water Treatment Facility

SOL #: 1240LN26Q0003Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 3
Ogden, UT, 844012310, United States

Place of Performance

CO

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 16, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Apr 22, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for Water Treatment Facility improvements at the Monument Fire Center, Monument, Colorado. This project aims to ensure compliance with Colorado Department of Public Health and Environment (CDPHE) regulations by implementing Optimal Corrosion Control Treatment (OCCT) to address soluble lead in the well water. This is a Total Small Business Set-Aside. Proposals are due by April 22, 2026, at 5:00 PM Z.

Project Overview

The contractor will provide all labor, equipment, and materials to complete necessary improvements to the existing water treatment facility. The primary objective is to upgrade the facility to supply potable drinking water to fire center staff and achieve regulatory compliance regarding lead contamination.

Scope of Work

Key tasks include:

  • Installation of new and relocated treatment process equipment, such as filter housings, baffle tanks, chemical feed pumps, process monitoring instrumentation, and associated valves and piping.
  • Installation of all electrical wiring, HVAC, and piping, along with associated site work.
  • Demolition of the existing water treatment building after components are relocated.
  • Provision of all labor, materials, equipment, utilities, and freight for installation.
  • Mobilization, project management, and quality control.
  • Provision of temporary toilet facilities and trash abatement.
  • The Government will furnish the new water treatment building (installed by a separate project) and provide site water and electricity for construction purposes.

Contract Details

  • Contract Type: Firm Fixed-Price (Combined Synopsis/Solicitation - RFQ).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 236220 (Construction Of Miscellaneous Buildings) with a $45M size standard.
  • Period of Performance: From date of award through September 30, 2026. The new water treatment building is anticipated to be completed by April 30, 2026.
  • Wage Determination: Davis-Bacon Act prevailing wage rates apply for El Paso County, Colorado.

Submission & Evaluation

Quotations must include separate technical and price volumes and adhere to specific formatting requirements. Award will be made to the quoter representing the best value to the Government, considering both non-price and price factors. An acceptable technical rating is required. The Government may award to other than the lowest-priced quotation. Proposals must hold prices firm for 90 calendar days.

Key Dates & Contacts

  • Proposal Due Date: April 22, 2026, at 5:00 PM Z.
  • Anticipated Award: Within 90 days of proposal submission.
  • Contact: Crystal Amos, crystal.amos@usda.gov, 618-467-8347.

Clarifications & Notes

  • A temporary shutdown of the system is anticipated; the contractor will determine the duration.
  • Normal work hours are Monday-Friday, 0700-1800; work outside these hours requires prior written approval.
  • One virtual pre-work meeting is anticipated, with on-site meetings accommodated upon request.
  • The completion date of September 30, 2026, remains firm.
  • The contractor is responsible for providing new chemical injection and pH sensors, and pressure transmitter connections.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Water Treatment Facility | GovScope