Water treatment services at Coast Guard Station Crystal River, FL

SOL #: 70Z028-26-Q-0021582Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE MIAMI(00028)
MIAMI, FL, 33132, United States

Place of Performance

Inglis, FL

NAICS

Water Supply and Irrigation Systems (221310)

PSC

Quality Control Services: Water Purification And Sewage Treatment Equipment (H146)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
May 1, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard is soliciting proposals for Water Treatment Services at Coast Guard Station Crystal River, FL. This is a Firm Fixed-Price service contract, set aside for Total Small Businesses. The requirement includes operation, maintenance, and compliance for the water treatment facility. Quotes are due by May 1, 2026, at 3:00 PM EST.

Scope of Work

The contractor shall provide all personnel, management, materials, supplies, equipment, and tools necessary for Preventive Maintenance Services (PMS) and operations of the water treatment equipment. This includes:

  • Operational Services: Obtaining operational clearance from the Florida DEP, performing bacteriological and chemical testing, and operating/maintaining the public water system in compliance with Florida Administrative Code (FAC) Rules 62-550, 62-555, 62-555.350, and 62-560. This involves maintaining a minimum free chlorine residual of 0.2 mg/l and a system pressure of 20 psi.
  • Routine Preventative Maintenance: Performing maintenance according to manufacturer instructions and industry standards on specified equipment.
  • Routine Service Calls: Responding to service calls within 24 hours for troubleshooting and repairs. Corrective maintenance is included, not to exceed $20,000 and 40 labor hours per 12-month period.
  • Reporting: Submitting monthly operations reports (DEP Form 62-555.900(3)) and monthly PM reports.

Contract Details

  • Solicitation Number: 70Z028-26-Q-0021582
  • Contract Type: Firm Fixed-Price service contract
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 221310 (Water Supply and Irrigation Systems), Size Standard: $41.0 Million
  • Duration: One base year plus two (2) 12-month option years, not to exceed 36 months total.
  • Award Basis: Best Value, considering Past Performance and Cost factors.
  • Acquisition Procedures: Simplified Acquisition Procedures (FAR Part 13 and Part 15).
  • Wage Determination: 2015-2727, Rev no: 29 dated 12/03/2025, applicable to Citrus County, Florida.

Key Requirements & Submission

  • Personnel: Requires a Class D (or higher) licensed chief operator, and a Supervisor/Project Manager.
  • Quality Control: Contractor must develop and maintain a Quality Control Plan (QCP).
  • Past Performance: Provide past performance documents to demonstrate expertise.
  • Price Breakdown: Request a price breakdown for labor and supervision for monthly services.
  • SAM Registration: Vendors must be actively registered in SAM.gov with the applicable NAICS code prior to award.
  • Site Visit: Highly recommended and encouraged. Coordinate with Petty Officer John B. Piskura (John.B.Piskura@uscg.mil, 352-447-6900).
  • Q&A Deadline: Questions must be sent to Jerry.Lopez@uscg.mil by April 10, 2026, COB. Answers will be posted as an amendment.

Important Dates

  • Quotes Due: May 1, 2026, 3:00 PM EST. Submit to Jerry.Lopez@uscg.mil.
  • Anticipated Award Date: May 10, 2026 (10 business days after close of solicitation).
  • Performance Start: No later than 10 business days after award.

People

Points of Contact

MK1 John PiskuraPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
View