Wattmeter Calibration Systems
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, Naval Surface Warfare Center, is soliciting proposals for Wattmeter Calibration Systems. This is a combined synopsis/solicitation for a five-year Indefinite Delivery/Indefinite-Quantity (IDIQ) Firm-Fixed-Price contract to modernize and enhance the Navy's radio frequency wattmeter calibration capabilities. Proposals are due February 10, 2026.
Scope of Work
The requirement is for a complete, integrated turnkey solution comprising up to eleven (11) Wattmeter Calibration Systems (WCS) and one (1) Primary Lab Wattmeter Calibration System (PLWCS). These systems must meet detailed specifications outlined in Calibration Standards Specification (CSS) 01-3243 (WCS) and CSS 01-3246 (PLWCS). The scope includes installation, three days of training for up to ten personnel per delivery order, and extensive documentation.
Key Requirements & Deliverables
- Turnkey Solution: Proposals for component-only solutions will be deemed non-responsive.
- Cybersecurity: Offerors must comply with Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self), recorded in SPRS prior to award, as per DFARS 252.204-7021 and 252.204-7025.
- Documentation (CDRLs): Required deliverables include COTS manuals, calibration certifications/reports, instrument calibration procedures, software version descriptions, software/firmware change requests, proposed spare parts lists, measurement uncertainty analysis, software license requirements list, software sustainability package (including source code), and training syllabi.
- Past Performance: Bidders must provide detailed past performance references using the provided form.
- SAM Registration: Contractors must be registered in the System for Award Management (SAM).
Contract & Timeline
- Contract Type: IDIQ Firm-Fixed-Price
- Period of Performance: Five-year ordering period, May 27, 2026, to May 27, 2031.
- Set-Aside: None specified.
- Response Due: February 10, 2026, 00:30 AM EST.
- Published: February 2, 2026.
Evaluation
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Evaluation factors include Price, Technical Approach (acceptable/unacceptable), Past Performance (acceptable/unacceptable), and Contract Documentation (go/no-go). Proposals must be valid for 180 calendar days.
Updates
Amendment 0001 (January 12, 2026) added CMMC requirements. A Questions and Answers document (February 2, 2026) clarified the turnkey solution, CMMC Level 1 (Self), and indicated a forthcoming Amendment 0002 to revise delivery dates.