WEAPON CONTROL COMP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, has issued a Solicitation (RFQ) for the repair of WEAPON CONTROL COMP (Product Service Code 1220 - Fire Control Computing Sights And Devices). This opportunity requires a Repair Turnaround Time (RTAT) of 110 days and Government Source Inspection (GSI). Only authorized distributors of the original manufacturer's item will be considered for award. Quotes are due by May 5, 2026, 8:30 PM EST.
Scope of Work
This contract covers the repair and quality requirements for the WEAPON CONTROL COMP, specifically for CAGE 15090, Reference Number 7485673-004. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings and technical orders. Items must be marked in accordance with MIL-STD-130, REV N, 16 NOV 2012. Changes in design, material, servicing, or part number require prior approval from the NAVICP-MECH Contracting Officer, except for identical part number changes.
Contract & Timeline
- Opportunity Type: Solicitation (RFQ for Repair)
- Award Type: Bilateral, requiring contractor's signed acceptance.
- Set-Aside: None specified.
- Required RTAT: 110 days (measured from physical receipt of asset to Government acceptance).
- Quote Due: May 5, 2026, 8:30 PM EST
- Published: January 7, 2026
Key Requirements & Evaluation
Offerors must provide a quote including unit price, total price, and proposed RTAT. If the proposed RTAT exceeds 110 days, capacity constraints must be explained. Pricing must be firm and include all costs associated with complete repair, even for unwhole or damaged materials. A price reduction clause is in effect for unexcusable delays in meeting the RTAT, with offerors required to state their proposed reduction amount per unit per month, up to a maximum. For items not previously purchased or with increased prices, historical pricing or justification is required. Testing and Evaluation (T&E) fees for Beyond Repair (BR) items must also be quoted. Proof of authorized distributorship on company letterhead is mandatory for consideration.
Additional Notes
Government Source Inspection (GSI) is required. Freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Contractors must accurately report all transactions in CAV within five business days of receipt. Information on obtaining applicable documents (MIL-STDs, etc.) is provided in the solicitation. Contact: Logan W. Mann at LOGAN.W.MANN.CIV@US.NAVY.MIL or 717-605-1381.