Western Oregon POD2 Server Room Upgrades

SOL #: 75H70126Q00023Combined Synopsis/Solicitation

Overview

Buyer

Health And Human Services
Indian Health Service
DIV OF ENGINEERING SVCS - SEATTLE
SEATTLE, WA, 98121, United States

Place of Performance

OR

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Other Hospital Buildings (Z2DZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
Jun 14, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Indian Health Service (IHS), through the Division of Engineering Services - Seattle, is soliciting quotes for Western Oregon POD2 Server Room Upgrades at the Chemawa Health Center in Salem, Oregon. This project involves critical HVAC and electrical infrastructure improvements to support upgraded IT equipment. This is a 100% Small Business Set-Aside. Quotes are due June 14, 2026, at 2:00 PM CST.

Scope of Work

The project's objective is to provide a fully operational electrical and HVAC infrastructure for the Pod 2 Server Room at the Western Oregon Service Unit (WOSU). Key tasks include:

  • HVAC System Upgrade: Removal of the existing 1-ton mini-split and installation of a new approximately 3-ton variable-capacity mini-split heat pump system, including condensate management and controls.
  • Electrical System Upgrade: Evaluation of existing 208/240V sources and provision of upstream infrastructure (e.g., 480V feeder, transformer, new subpanel) to supply sixteen (16) new 20-amp, 208/240V, NEMA L6-20R twist-lock receptacle circuits.
  • Coordination: All work must be coordinated to maintain continuous server room operations and protect patient care activities.
  • Compliance: Adherence to EPA Section 608, NFPA 70 (NEC), NFPA 70E, UMC, IBC, applicable Oregon state codes, and manufacturer specifications.
  • Prevailing Wages: Bidders must account for prevailing wage rates for Marion and Polk Counties, Oregon, as specified in the provided wage determination (OR20260104).

Contract & Timeline

  • Contract Type: Firm Fixed Price (implied).
  • Estimated Magnitude: Between $25,000.00 and $100,000.00.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 30 calendar days after NTP.
  • Quote Due Date: June 14, 2026, at 2:00 PM CST.
  • Published Date: May 14, 2026.
  • Site Visit: A formal site visit is scheduled for May 21, 2026, at 10:00 AM PDT at the project location.

Submission & Evaluation

Award will be based on price and compliance with terms and conditions. Required submissions include:

  • Completed SF1442 (Blocks 14-20c).
  • Completed Section B, Price Schedule (using the provided template, currently with zero values).
  • Copy of appropriate licensing.
  • EPA 608 Certifications, including relevant experience.
  • A brief narrative demonstrating understanding of project requirements and approach to maintaining continuous operations. Quotes must be submitted in electronic PDF format via email to Robert.Miller2@ihs.gov. Questions must be submitted in writing to the same email no later than 7 days prior to the quote due date.

Eligibility & Notes

  • Set-Aside: 100% Small Business Set-Aside.
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19.0 million.
  • Bonds: Bid Bond and Performance/Payment Bonds are NOT required.
  • Contact: Primary point of contact is Robert S. Miller at robert.miller2@ihs.gov or 214-767-8589.

People

Points of Contact

Robert S. MillerPRIMARY
Andrew E. HartSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 14, 2026
Version 1
Sources Sought
Posted: Apr 21, 2026
View
Western Oregon POD2 Server Room Upgrades | GovScope