Z--Wet Well Rehabilitation - Lake Mead NRA (NV and AZ

SOL #: 140P8126Q0020Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
PWR LAME(81000)
BOULDER CITY, NV, 89005, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Other Utilities (Z1NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
Jun 3, 2026
3
Submission Deadline
Jun 6, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), specifically the Lake Mead National Recreation Area, is soliciting proposals for Wet Well Rehabilitation services in Nevada and Arizona. This opportunity is a Total Small Business Set-Aside for cleaning, repairing, and applying protective coatings to three wet wells, including necessary bypass pumping. The latest amendment extends the offer due date to June 5, 2026, at 1700 PD.

Scope of Work

The contractor will be responsible for the rehabilitation of three wet wells: one at Temple Bar, AZ, and two at Katherine Landing, AZ. Key tasks include:

  • Cleaning, repair, and installation of protective coating (QRM Structure Guard SE1000 or approved equal) on the wet wells.
  • Surface preparation for the Temple Bar wet well, including removal of failing liner material and sealing cracks/holes.
  • Sealing all pipe intrusions in the wet wells prior to coating.
  • Provision of bypass pumping during coating installation to manage sewage flow. A bypass pumping plan must be submitted for approval.
  • Development and adherence to a Confined Space Entry Program SOP.
  • Installation of safety barriers to secure the work zone. All coatings must meet ASTM D638, D790, D695, and D4541 compliance.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFQ), Firm Fixed Price Award, Lump Sum.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237110 (Construction of Water and Sewer Lines and Related Structures) with a $45M size standard.
  • Product/Service Code: Z1NZ (Maintenance Of Other Utilities).
  • Period of Performance: September 28, 2026, to March 28, 2027 (as updated by Amendment 3).

Submission & Evaluation

  • Quotes must be submitted via email to Bradley_metler@nps.gov.
  • Offerors must be registered in the System for Award Management (SAM).
  • Evaluation Criteria: Comparative evaluation based on PRICE, TECHNICAL approach, and PRIOR EXPERIENCE.
    • The technical approach should demonstrate direct superintendence, quality control, safety, and schedule management.
    • Prior experience requires three examples (within the last five years) of similar size, complexity, and scope, with contact information for references.
  • Offerors must acknowledge receipt of all amendments.

Key Dates & Contacts

  • Offer Due Date: June 5, 2026, at 1700 PD (Pacific Daylight Time).
  • Published Date: May 26, 2026 (latest amendment).
  • A site visit was scheduled for May 6, 2026, at 0800 Local Time at 101 Katzenbach Dr, Boulder City, NV 89005.
  • Primary Contact: Bradley Metler (Bradley_Metler@nps.gov).

Additional Notes

Attachments include the Statement of Work (SOW) and Wage Determinations for Clark County, NV, and Mohave County, AZ, which are critical for understanding labor costs. Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP).

People

Points of Contact

Metler, BradleyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Jun 3, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 26, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View