White City Southern Oregon Rehabilitation Center and Clinics Seismic Upgrades
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) Portland District has issued a Pre-solicitation Synopsis for the White City Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades project in White City, OR. This notice informs construction firms of an upcoming unrestricted, competitively negotiated, two-phase Design-Build (D-B) contract with a target ceiling of $260M. The project involves significant construction and demolition at the VA SORCC campus. The solicitation is tentatively scheduled for release in 2Q 2026, with an anticipated award in 3Q 2027.
Scope of Work
The project requires a contractor to design and build two new buildings (B300 and B301), three new connecting corridors, and a new surface parking lot. Key components include:
- Site Work and Demolition: Demolition of two existing buildings and four connecting corridors (approx. 46,500 BGSF), existing parking lots, and construction of a new 188-space surface parking lot. Includes road, sidewalk, utility, landscape, and grading upgrades.
- Construction of New B300 Support Building: Approximately 80,074 BGSF, with two new two-story connecting corridors (approx. 4,388 BGSF). Will house Office of Information Technology, Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service.
- Construction of B301 Primary and Specialty Care Building: Approximately 96,946 BGSF, one new connecting corridor (approx. 1,400 BGSF), and renovation of 1,000 BGSF of existing building B201A. Will house Primary Care, Radiology, Dental, and Pharmacy functions.
Contract & Timeline
- Type: Firm-Fixed-Price (FFP), Design-Build (D-B) contract.
- Acquisition Strategy: Unrestricted, competitively negotiated, Best Value Trade-Off (BVTO) using FAR Part 15 and FAR Subpart 36.3.
- NAICS: 236220 – "Commercial and Institutional Building Construction" (Size Standard: $45M).
- PSC: Y1DA – "Construction of Hospitals and Infirmaries".
- Target Ceiling Price: $260M (total contract award, design and construction).
- Period of Performance: 47 Months.
- Phase 1 Solicitation Release: Tentatively back half of 2Q 2026 (proposals due 60 days after).
- Phase 2 Solicitation Release: Tentatively 3Q 2026 (proposals due 120 days after).
- Anticipated Award: 3Q 2027.
Evaluation
Proposals will be evaluated in two phases:
- Phase I Factors: Designer of Record (DOR)/Design Approach and Past Performance.
- Phase II Factors: Concept Design Narrative, Concept Design Drawings, Concept Schedule, Small Business Commitment Plan (SBCP), Project Labor Agreement (PLA), and Cost/Price.
- Stipends: Anticipated $400,000 for Phase 2 participants meeting specific requirements.
Submission Requirements
- All proposal documents must be submitted electronically through the PIEE Solicitation Module. Offerors must register for a PIEE account and add the 'Proposal Manager' role. (Refer to
Vendor Instructions for PIEE Solicitation Module.pdffor details). - Cybersecurity Maturity Model Certification (CMMC): Anticipated CMMC Level 2 (Self) Certified is required. Relevant DFARS and FAR clauses will be included.
- SAM Registration: Offerors must be actively registered in SAM.gov.
Industry Engagement
- An in-person Industry Day was held on January 22, 2026. Slides are available on SAM.gov.
- A virtual industry day was held in April 2025, with an attendee list available (
List of Attendees - WC SORCC Industry Day April 2025.pdf). - A third, pre-recorded Industry Day with more detailed information will be posted the first week of February 2026.
Additional Notes
This is a PRE-SOLICITATION NOTICE only. It is not a request for proposals, and any proposals received will not be accepted or evaluated. The government reserves the right to cancel the solicitation. The USACE-NWP Contracting Office is the sole point of contact. Email inquiries to Nicole Adams (Nicole.A.Adams@usace.army.mil) and Jaren Bowman (Jaren.L.Bowman@usace.army.mil).