WHITETAIL ROAD 224 CONSTRUCTION

SOL #: 1240LT26Q0048Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA FOREST SERVICE-SPOC IM
Washington, DC, 202500001, United States

Place of Performance

Halsey, NE

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
Jun 3, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the Whitetail Road 224 Construction Project in Halsey, NE. This Total Small Business Set-Aside opportunity involves constructing and improving approximately 1.7 miles of roadway, including embankment, geogrid installation, aggregate placement, and erosion control. The project magnitude is estimated between $250,000 and $500,000. Quotes are due June 3, 2026, at 9:00 a.m. Central Time.

Scope of Work

Work for this project includes:

  • Constructing a roadway embankment with up to six turnouts and lead-off ditches.
  • Installing approximately 10,484 square yards of 10-foot wide multi-axial geogrid geosynthetic (e.g., Tensar TriAx or InterAx).
  • Furnishing, placing, and compacting approximately 2,420 cubic yards of aggregate material base course (12-foot wide, 6-inch depth) on the geogrid.
  • Seeding and installing specified erosion control material on approximately 8 acres of disturbed areas.
  • Final shaping of the 14-foot wide roadway surface.
  • An optional item for additional aggregate placement is included. Work will be performed on a designated 1.7-mile section of Whitetail Road #224, located in the Bessey Ranger District, approximately 10 miles southwest of the Bessey Ranger District Office.

Contract Details

  • Contract Type: Firm-Fixed Price
  • Estimated Period of Performance: July 13, 2026, to October 30, 2026 (construction season ends by October 31, 2026).
  • Set-Aside: Total Small Business Aside
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard.
  • Project Magnitude: $250,000 to $500,000.

Submission & Evaluation

  • Quotes Due: June 3, 2026, by 9:00 a.m. Central Time.
  • Submission Method: Email quotes to Janice King (janice.king@usda.gov) and Lucas Dahlman (lucas.dahlman@usda.gov). The subject line must include "WHITETAIL ROAD 224 CONSTRUCTION PROJECT - 1240LT26Q0048".
  • Evaluation Criteria: Quotes will be evaluated based on technical approach, understanding of the project, and price. Award will be made to the offeror representing the best value to the Government, without tradeoffs.
  • Requirements: A bid bond/offer guarantee (20% of quote) is required. Performance and Payment Bonds are required if the award exceeds $35,000 or $150,000, respectively. Compliance with Davis-Bacon Act wage rates is mandatory.

Additional Notes

Amendment 0002, posted May 7, 2026, provided responses to contractor questions, clarifying details on water sources, compaction methods, geogrid specifications, public access, and aggregate requirements. Cultural resources clearance has been completed, with no historic properties affected. Contractors are responsible for field verification, obtaining hauling permits, and providing adequate signage.

People

Points of Contact

Janice KingPRIMARY
Lucas DahlmanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View