Whitney Lake Powerhouse Roof Repairs

SOL #: W9126G26RA059Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W076 ENDIST FT WORTH
FORT WORTH, TX, 76102-6124, United States

Place of Performance

Place of performance not available

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 11, 2026
2
Last Updated
Mar 11, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, Fort Worth District (W076 ENDIST FT WORTH), is issuing a presolicitation for Whitney Lake Powerhouse Roof Repairs. This is a competitive, Firm-Fixed Price, Small Business Set-Aside opportunity for construction services. The solicitation, number W9126G26RA059, is expected to be posted on or about March 26, 2026.

Scope of Work

The contractor will provide all necessary personnel, equipment, and services to replace multiple levels of roofs at the Whitney Dam Powerhouse. This includes TPO and Standing Seam Metal Roof systems, as well as replacing existing metal roof panels, gutters, and downspouts at the Generation Bay. The project requires a structural survey of the existing roof overbuild steel framing system prior to construction, with sufficient as-built data for third-party replication of structural analysis or fabrication.

Contract & Timeline

  • Type: Competitive, Firm-Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product/Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
  • Period of Performance: 110 calendar days (base + option period)
  • Solicitation Posting: On or about March 26, 2026
  • Published Date: March 11, 2026 (Presolicitation)

Submission Requirements

Offerors must be registered in SAM.gov and are required to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) before award. Proposals will be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite (piee.eb.mil). Offerors must monitor SAM.gov daily for the solicitation (W9126G26RA059) and any amendments.

Contact Information

For inquiries, contact Angelina PinaHardin at angelina.l.pinahardin@usace.army.mil.

People

Points of Contact

Angelina PinaHardinPRIMARY

Files

Files

View
View
View
View

Versions

Version 2Viewing
Pre-Solicitation
Posted: Mar 11, 2026
Version 1
Pre-Solicitation
Posted: Mar 11, 2026
View
Whitney Lake Powerhouse Roof Repairs | GovScope