Construction/Replacement of HVAC Replacement at Wright-Patterson Air Force Base, OH (W912QR25B0053)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
*ATTN: Special Notice dated 3 Jul 2025 - An amendment is forthcoming to incorporate site visit information for 9 Jul 2025. This notice contains pertinent information regarding RSVP details required (in attached pdf 'W912QR25B0053 Site Visit Notice - RSVP Required by 7 Jul 2025).
This project is for the design/bid/build construction of a comprehensive replacement of the Heating Ventilation and Air Conditioning (HVAC) system in facility 20824, a two story (with penthouse), 49,000 square feet (SF) research building comprised of both research laboratory and administrative space. Work includes replacement and consolidation of existing AHUs while converting the facility to variable air volume from a patchwork of other system types. The new modular chiller-heater will be capable of delivering 210 tons of cooling and 1,845 MBH of heating.