WVARNG VBSA EXCAVATING AND GRAVEL WORK
SOL #: W912L8-26-B-A001Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W7N7 USPFO ACTIVITY WV ARNG
BUCKHANNON, WV, 26201-8819, United States
Place of Performance
Glen Jean, WV
NAICS
Site Preparation Contractors (238910)
PSC
Construction Of Other Non Building Facilities (Y1PZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 28, 2026
2
Submission Deadline
Jun 11, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The West Virginia Army National Guard (WVARNG) is soliciting bids for Excavation and Gravel Work at Base Camp Victory in Glen Jean, WV. This is a Total Small Business Set-Aside opportunity for a Firm Fixed Price (FFP) contract, estimated between $25,000 and $100,000. The project involves compacting gravel and dirt, spreading new gravel, and creating a pedestrian walkway. Bids are due by June 11, 2026, at 1:00 PM local time.
Scope of Work
The project focuses on excavation and gravel work across several designated "PADs" at Base Camp Victory. Key tasks include:
- Grading and Compaction: Light grading to clear ruts and pooling areas, followed by compaction of gravel and dirt on PADs 1, 3, 4, 5, and 6.
- Gravel Spreading: Spreading new gravel on a bare section of PAD 2 (approximately 0.3 acres, 2 inches deep after compaction).
- Rip-Rap Movement: Moving approximately 35 tons of 6-inch rip-rap from PAD 5 to the eastern section of PAD 7.
- Pedestrian Walkway: Construction of a 100-yard long, 6-foot wide walkway connecting PADs 2, 3, and 4, using crusher run limestone and compacted gravel.
- Final Cleanup: Removal of all debris and waste materials upon completion.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP)
- Estimated Magnitude: Between $25,000 and $100,000
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238910 (Site Preparation Contractors) with a $19.0M size standard
- Period of Performance: Estimated June 15, 2026 - June 26, 2026 (10 calendar days after award/notice to proceed)
- Wage Determination: Applicable, General Decision Number WV20260102 for Highway Construction in Fayette County, WV.
- Bid Due Date: June 11, 2026, 1:00 PM local time
- Published Date: May 28, 2026
Submission & Evaluation
- Bid Submission: Sealed bids are required, with electronic submission authorized. Bids will be publicly opened at the same time and date as the due date.
- Evaluation: Award will be made to the responsible bidder whose bid conforms to the invitation and is most advantageous to the Government, considering only price and price-related factors.
- Offer Acceptance: Offers must provide for at least 10 calendar days for Government acceptance.
- Requirements: A Bid Bond (SF24 form) is required. Firms must be registered in SAM.gov. Offerors must acknowledge all amendments.
Additional Notes
- Pre-Bid Conference and Site Visit: Scheduled for June 3, 2026, at 10:00 AM at 409 Wood Mountain Rd., Glen Jean, WV.
- Questions Due: By the third working day prior to bid opening (June 8, 2026).
- Contact: Kimberly Rowan, kimberly.s.rowan.civ@army.mil, 304-473-5013.
People
Points of Contact
Kimberly RowanPRIMARY
Files
Versions
Version 1Viewing
Solicitation
Posted: May 28, 2026