WWYK240015 - Rehab Tanks 62501E & 62501W

SOL #: FA813726R0020Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Sewage And Waste Facilities (Z2ND)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Submission Deadline
Jun 2, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the rehabilitation of Tanks 62501E & 62501W at the Tinker AFB Industrial Waste Treatment Plant in S Coffeyville, OK. This project, identified as WWYK240015, involves significant upgrades to the tanks' infrastructure. Proposals are due by June 2, 2026.

Scope of Work

This project requires the replacement of the cathodic protection system for both tanks and electrical upgrades for the raised platform. Contractors will strip and replace interior tank coatings and piping to the four control valves, as well as clean and recoat the exterior stairs, raised platform, and associated structures. The Statement of Work (SOW) further details requirements including a site investigation, logistical, architectural, and structural work, repair/replacement of secondary containment seals, and construction waste disposal. Detailed drawings (Att12_240015-Drawings.pdf) provide specific plans and technical requirements.

Contract Details

  • Type: Solicitation (FA813726R0020) for a Firm Fixed Price contract.
  • Magnitude: Estimated between $1,000,000 and $5,000,000.
  • Period of Performance: 310 calendar days after Notice to Proceed (NTP).
  • Funding: Obligation is contingent upon the availability of appropriated funds.
  • Bonds: Performance and Payment Bonds are required within 10 calendar days after award.

Eligibility & Set-Aside

This opportunity is ONLY available to CURRENT Tinker AFB - MAC BOA Holders.

Submission & Evaluation

Proposals are due by June 2, 2026, at 02:00 PM local time. Evaluation will be based on Lowest Priced Technically Acceptable (LPTA) source selection procedures, requiring complete technical and price volumes. A mandatory Initial Site Visit is scheduled for Friday, April 24, 2026, at 10:00 am. Interested MAC BOA Holders must RSVP via email to SSgt Isaac Demmers within 5 calendar days from the posting date (April 15, 2026), indicating interest and providing an Entry Access List (EAL) if base access is required for attendees.

Special Requirements & Notes

Contractor personnel will require badges for Tinker AFB access, and key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) with specific experience are mandatory. Compliance with EM 385-1-1 (Safety and Health) and FOD awareness training is required. A Wage Determination (1 Jan 26.pdf) outlines prevailing wage rates for heavy construction in Oklahoma County, which must be adhered to. A comprehensive Submittal Register (Att11_240015_Submittal Register.pdf) lists all required documentation for review and approval.

People

Points of Contact

Isaac DemmersPRIMARY
Tamra TorresSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 15, 2026
WWYK240015 - Rehab Tanks 62501E & 62501W | GovScope