WWYK250096 - Repair Stormwater Spill Gate 11 Structure

SOL #: FA813726R0032SolicitationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Women-Owned Small Business (WOSB) Program Sole Source (FAR 19.15) (WOSBSS)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 5, 2026
3
Submission Deadline
Jul 20, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically AFSC PZIOC, is soliciting proposals for the Repair of Stormwater Spill Gate 11 Structure at Tinker Air Force Base, Oklahoma. This opportunity is a Women-Owned Small Business (WOSB) Program Sole Source set-aside under NAICS 237990. A mandatory site visit is required for eligibility, with RSVPs due by June 12, 2026. Proposals are due July 20, 2026.

Scope of Work

The project, identified as WWYK250096, involves furnishing all materials, labor, and equipment to repair the concrete spill gate structure (Spill Gate 11 / Outfall 9). The primary goal is to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Soldier Creek. The Statement of Work (SOW) details requirements including a site investigation, logistical, architectural, and structural work, and field verification of existing conditions. Key personnel requirements include a Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, each with specific experience qualifications.

Contract & Timeline

  • Contract Type: Solicitation (FA813726R0032)
  • Set-Aside: Women-Owned Small Business (WOSB) Program Sole Source
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45,000,000 size standard.
  • Product Service Code: Z2KA (Repair Or Alteration Of Dams)
  • Estimated Magnitude: $1,000,000 - $5,000,000
  • Period of Performance: 270 calendar days from Notice to Proceed.
  • Published Date: June 5, 2026
  • RSVP for Site Visit Due: June 12, 2026, 2:00 PM CT (email austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil)
  • Questions Due: June 25, 2026
  • Proposal Due: July 20, 2026, 2:00 PM CST

Evaluation

Award will be based on a Lowest Price Technically Acceptable (LPTA) methodology. Proposals will be evaluated on technical approach (Capability and Management, Schedule and Planning) and price. Only technically acceptable proposals will be considered for award.

Key Requirements & Documents

  • Mandatory Site Visit: Attendance is required for eligibility to propose. RSVP by the deadline, including an Entry Access List (EAL) if base access is needed for personnel.
  • Base Standards: Bidders must comply with Tinker AFB Facility Standards (2020 Edition), Mechanical Standards (2026 Edition), Electrical Standards (2026 Edition), and Fire Protection Standards (2026 Edition).
  • Submittals: A Submittal Register (Att 11) outlines required documentation throughout the project lifecycle.
  • Environmental: Compliance with Recovered Materials Determination Form (RMDF) requirements for environmentally preferable purchasing.
  • Wage Rates: Adherence to the U.S. Department of Labor's prevailing wage rates for Oklahoma County, Oklahoma (Davis-Bacon Act).
  • Base Access: Contractors must comply with Tinker AFB contractor access and badge requirements, including background checks.

Contact Information

People

Points of Contact

Austin ElmPRIMARY
Sharla FlowersSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Jun 5, 2026
Version 1
Pre-Solicitation
Posted: May 4, 2026
View