Y--Grand Canyon Industry Day for upcoming projects

SOL #: 140P2026R0080Special Notice

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
May 20, 2026
2
Action Date
Jun 10, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS) is hosting a virtual Industry Day for upcoming construction and utility rehabilitation projects at Grand Canyon National Park's North and South Rims. This Special Notice is designed to brief prime contractors and subcontractors on future opportunities. Participation requests are due June 10, 2026.

Scope of Projects

The industry day will feature presentations on several significant projects, including:

  • GRCA 318719 – North Rim & Roaring Springs Utilities Rehabilitation: Improvements to utility systems (water, wastewater, electrical, communications) on the North Rim and inner canyon sites. Expected solicitation: Summer 2026.
  • GRCA 318719 – Construct Temporary Wastewater Treatment Plant at North Rim: Installation of a temporary 90,000 gpd WWTP. Expected solicitation: Summer 2026.
  • GRCA 352119 – North Rim Critical Utility Restoration: Repair and restoration of potable water, sanitary sewer, and electrical distribution systems damaged by wildfire. Expected solicitation: Summer 2026.
  • GRCA 353101 – North Rim Construct Heavy Equipment Maintenance Facility: Construction of a new facility for heavy equipment maintenance. Expected solicitation: Late 2026 or early 2027.
  • GRCA 257282 – Replace South Rim Wastewater Treatment Plant: Construction of a new 0.65 MGD MBR WWTP on the South Rim. Expected solicitation: Summer 2026.
  • GRCA 318719 – North Rim Utilities - Replace North Rim Wastewater Treatment Plant: Construction of a new 0.13 MGD MBR WWTP on the North Rim. Expected solicitation: Fall 2027.

Contract & Timeline

  • Type: Special Notice (Industry Day)
  • Set-Aside: None specified for this informational event.
  • Participation Request Due: June 10, 2026
  • Published: May 20, 2026

Participation

This is an informational session with project presentations; it is not a question-and-answer session. Interested prime contractors and subcontractors must provide their contact name, email address, and firm name to attend.

Additional Notes

Key NAICS codes relevant to these projects include 221320 (Sewage Treatment Facilities), 237110 (Water Sewer Line Construction), 237120 (Oil and Gas Pipeline Construction), and 238210 (Power Upgrades/Linework). Vendors are advised to monitor www.SAM.gov for official solicitations and updates. Active SAM registration and a UEI number are required to conduct business with the Federal Government.

People

Points of Contact

Waller, JamesPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Special Notice
Posted: May 20, 2026
Y--Grand Canyon Industry Day for upcoming projects | GovScope