Y--Grand Teton NP Industry Day and Project Outreach
SOL #: DOIPFBO250035Special Notice
Overview
Buyer
Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States
Place of Performance
Place of performance not available
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Construction Of Miscellaneous Buildings (Y1JZ)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Dec 23, 2025
2
Last Updated
Jan 7, 2026
3
Action Date
Dec 10, 2025, 10:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Amendment 1 12/22/2025 adds sign in sheets and industry day slides with notes.
DOIPFBO250035 - Industry Day and Project Outreach (See attached for a word document of the below information).
The National Park Service (NPS), Contracting Operations Central (ConOps Central), Northern Rockies Major Acquisition Buying Office (MABO) Contracting Office and Grand Teton National Park invite contractors to participate in an Industry Days and Project Outreach event. This session will provide information on upcoming projects and opportunities for open discussion in accordance with the Federal Acquisition Regulation (FAR).
The event will take place in Moose, WY, and the Craig Thomas Discovery and Visitor Center (CTDVC). RSVP to molly_lynam@nps.gov at least 24 hours prior to the event.
Directions to the CTDVC from downtown Jackson, WY:
1. Head north on US-26 / US-89 / US-191 toward Grand Teton National Park.
2. Continue on US-26/89/191 for approximately 13 miles toward Moose Junction.
3. At the junction for Teton Park Road (signed for Moose and Grand Teton National Park), turn left (west) into the park.
4. Drive approximately 0.5 mile on Teton Park Road.
5. The Craig Thomas Discovery & Visitor Center will be on your left, at the first stop sign after your cross the Snake River Bridge.
At 9am to approximately 11 am on December 10, 2025 - National Park Service will be presenting future 2027+ projects. Examples of possible projects:
Moose Entrance Station
4LF Phase II Historic Building Rehabilitation
Visitor Contact Building at Mormon Row
Roadway pullout work
Cattleman's parking area
Colter Bay Pedestrian Rehab
Historic Housing Rehabilitations
Jenny Lake Lodge Lift Station
String Lake Comfort Station Rehab
DOIPFBO250035 - Industry Day and Project Outreach (See attached for a word document of the below information).
The National Park Service (NPS), Contracting Operations Central (ConOps Central), Northern Rockies Major Acquisition Buying Office (MABO) Contracting Office and Grand Teton National Park invite contractors to participate in an Industry Days and Project Outreach event. This session will provide information on upcoming projects and opportunities for open discussion in accordance with the Federal Acquisition Regulation (FAR).
The event will take place in Moose, WY, and the Craig Thomas Discovery and Visitor Center (CTDVC). RSVP to molly_lynam@nps.gov at least 24 hours prior to the event.
Directions to the CTDVC from downtown Jackson, WY:
1. Head north on US-26 / US-89 / US-191 toward Grand Teton National Park.
2. Continue on US-26/89/191 for approximately 13 miles toward Moose Junction.
3. At the junction for Teton Park Road (signed for Moose and Grand Teton National Park), turn left (west) into the park.
4. Drive approximately 0.5 mile on Teton Park Road.
5. The Craig Thomas Discovery & Visitor Center will be on your left, at the first stop sign after your cross the Snake River Bridge.
At 9am to approximately 11 am on December 10, 2025 - National Park Service will be presenting future 2027+ projects. Examples of possible projects:
Moose Entrance Station
4LF Phase II Historic Building Rehabilitation
Visitor Contact Building at Mormon Row
Roadway pullout work
Cattleman's parking area
Colter Bay Pedestrian Rehab
Historic Housing Rehabilitations
Jenny Lake Lodge Lift Station
String Lake Comfort Station Rehab
People
Points of Contact
Lynam, MollyPRIMARY