LAKE - EXTEND RAMP AT PEARCE FERRY

SOL #: 140P8126B0007Solicitation

Overview

Buyer

Interior
National Park Service
PWR LAME(81000)
BOULDER CITY, NV, 89005, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 27, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
Jul 8, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), is soliciting bids for a Firm Fixed Price contract to extend the ramp at Pearce Ferry within the Lake Mead National Recreation Area. This project is designated as a 100% Total Small Business Set-Aside. The estimated project magnitude is between $1.5M and $1.9M. Bids are due by July 8, 2026, at 1400 local time.

Scope of Work

This project involves significant improvements to the Pearce Ferry takeout ramp on the Colorado River. Key tasks include:

  • Expanding the existing takeout ramp by resetting 1800 SF of precast concrete panels to extend the ramp 55 feet towards the river.
  • Pouring a new 8,400 SF concrete pad for staging equipment and vehicles at the top of the launch ramp.
  • Widening the overall launch ramp by 40 feet to provide more launching and staging area. All work must be in strict compliance with the provided specifications and drawings.

Contract Details

  • Contract Type: Firm Fixed Price Invitation for Bid (IFB).
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237990 (Construction Of Other Non Building Facilities) with a $45M size standard.
  • Estimated Project Magnitude: $1.5M to $1.9M.
  • Period of Performance: Estimated to begin July 6, 2026, and conclude by November 28, 2026.

Submission & Evaluation

  • Submission Method: Electronic bids only. The entire bid package must be submitted as one .pdf file (maximum 34MB) via email to PWR_MABO_LAKE_Bid@nps.gov. The subject line must be "IFB 140P8126B0007 LAKE Extend Pearce Ferry Ramp".
  • Bid Requirements: A Bid Guarantee and Bid Bond are required. Offerors must acknowledge all solicitation amendments.
  • Proposal Due Date: July 8, 2026, at 1400 local time.
  • Bid Opening: Scheduled for 24 hours after the bid due date/time; further information will be provided via amendment.
  • Questions Deadline: All questions must be submitted in writing by June 10, 2026.
  • Evaluation: This is a Sealed Bid solicitation, and no specific evaluation factors are listed.

Key Attachments & Notes

Bidders should review critical attachments including:

  • Construction Drawings: Detailed plans, profiles, sections, and site surveys for the new launch ramp.
  • Project Specifications: Comprehensive technical requirements for general construction, concrete, earthwork, exterior improvements, and utilities.
  • Wage Determination: General Decision Number AZ20260058, specifying prevailing wage rates and fringe benefits for heavy construction in Mohave County, Arizona.
  • Limitation on Subcontracting Report Template: For tracking compliance with subcontracting requirements.
  • Construction Contract Administration: Information on FAR 36.211(b) regarding equitable adjustments for change orders. A site visit is scheduled for June 3, 2026, at 11 am local time at Pearce Ferry Boat Ramp.

People

Points of Contact

Bachelier, CarolinePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: May 21, 2026
Version 1
Pre-Solicitation
Posted: Apr 27, 2026
View
LAKE - EXTEND RAMP AT PEARCE FERRY | GovScope