Y--Pre-Solicitation Synopsis - COTP Design-Build
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy, Western-Sierra Nevada Region has issued a Pre-Solicitation Synopsis for the California Oregon Transmission Project (COTP) Series Capacitor Bank Two-Phase Design-Build Construction Project. This notice serves to inform potential bidders of an upcoming opportunity for construction of other utilities.
Scope of Work
This project involves a two-phase design-build construction for a Series Capacitor Bank as part of the California Oregon Transmission Project (COTP). The specific details of the design and construction requirements will be outlined in the forthcoming solicitation.
Contract & Timeline
- Type: Pre-Solicitation Synopsis
- Product/Service Code: Y1NZ (Construction Of Other Utilities)
- Set-Aside: None specified
- Response Due: To be determined in the future solicitation
- Published: December 9, 2025
Additional Notes
This is a pre-solicitation notice for planning purposes only and does not constitute a request for proposals or offers. Interested parties should monitor SAM.gov for the release of the official solicitation. For questions, contact Jonathan D. Dittmer at dittmer@wapa.gov or 605-353-2641.