Y1DA--36C25726R0012, 674-22-805 Upgrading Building Automation System Temple & Waco

SOL #: 36C25726R0012Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 16, 2025
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 20, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 17, is soliciting proposals for the Upgrading Building Automation System (VA Project No. 674-22-805) at the Olin E. Teague VAMC in Temple, TX, and the Doris Miller VAMC in Waco, TX. This 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside opportunity seeks to modernize HVAC and related systems. Proposals are due March 20, 2026.

Scope of Work

This project involves upgrading existing HVAC and related systems to a digital control system utilizing the Metasys BACNET MSTP network. Key tasks include replacing existing HVAC control devices with JCI Metasys devices, installing new PCs and portable operator terminals, providing new control cabinets, and replacing existing wall-mounted fan coil units and pressure-dependent dual duct VAVs. The contractor will also update fire alarm panel programming and relay modules as needed, and perform all necessary testing and commissioning.

Recent amendments incorporate additional specifications for FIRESTOPPING, JOINT SEALANTS, EARTHWORK (SHORT FORM), and PLANTING. Bidders must adhere to Pre-Construction Risk Assessment (PCRA) and Infection Control Risk Assessment (ICRA) requirements, with the project categorized as 'Small Scale' for PCRA.

Contract & Timeline

  • Type: Firm Fixed Price
  • Estimated Value: Between $10,000,000.00 and $20,000,000.00
  • Period of Performance: 548 calendar days after Notice to Proceed
  • Set-Aside: 100% Service-Disabled Veteran Owned Small Business (SDVOSB)
  • NAICS: 236220 - Commercial and Institutional Building Construction ($45M)
  • Proposal Due: March 20, 2026, at 10:00 AM CDTX
  • Published: February 27, 2026 (latest amendment)

Evaluation & Submission

Proposals will be evaluated using a Past Performance, Price Tradeoff (PPTO) process, where past performance is significantly more important than price. Submissions must be organized into four volumes: Technical Acceptability, Past Performance, Price, and Solicitation/Award Documents. Proposals must be emailed to Horacio.Fernandez@va.gov. Offerors must be verified SDVOSBs, have an Experience Modification Rating (EMR) less than or equal to 1.00, and comply with "Limitations on Subcontracting."

Key Clarifications & Requirements

Pre-bid Q&A clarified that BACnet MS/TP is the preferred communication method, and all end devices (controllers, sensors) are to be replaced. Past performance projects must be 100% complete. Staffing requires a separate full staff of on-site personnel for each location, and while a Superintendent can serve as QCM, the SSHO must be a separate qualified individual. Infection control measures, such as 1-hour temporary gypsum walls and HEPA carts, are required.

People

Points of Contact

Horacio FernandezContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Mar 6, 2026
View
Version 6Viewing
Solicitation
Posted: Feb 27, 2026
Version 5
Solicitation
Posted: Jan 27, 2026
View
Version 4
Solicitation
Posted: Dec 30, 2025
View
Version 3
Solicitation
Posted: Dec 12, 2025
View
Version 2
Solicitation
Posted: Dec 2, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 16, 2025
View