Y1DA--437-23-103 Update Wing 4B
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Construction work shall include, but shall not be limited to providing all labor, materials, equipment, etc. necessary to complete Fargo Veterans Affairs (VA) Health Care System construction project 437-23-104, Update Wing 4B. The project shall include, but shall not be limited to: construction of hard wall construction barriers, demolition of floors and ceiling, flooring, access panels, furniture and wall finishes per applicable fire codes and to satisfy fire ratings. All objects will be pick proof caulked into place. Phasing is critical to construction. Work Duties to include HVAC, lighting, plumbing, fire suppression and protection, to provide an overall "face-lift" renovation to the locked mental health ward.
All work is to be performed in accordance with the project plans and specifications.
Period of performance is 585 days.