Y1DA--FY26: NRM (PROJ:673-23-107) BB Install Continuous Water Quality for Legionella Directive Compliance
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Presolicitation Notice
Presolicitation Notice
Page 3 of 3
Presolicitation Notice
*=Required Field
Presolicitation Notice
Page 1 of 3
PROJECT TITLE: Bid Build (BB) Install Continuous Water Quality for Legionella Directive Compliance, Project No. 673-23-107
CONTRACT TYPE: Bid Build (BB), Firm Fixed Price
PROJECT SUMMARY: The contractor shall provide all labor, tools, and materials necessary for the following work: Bid-Build project to install a new water monitoring system. Project is located at the James A Haley Veteran s Hospital, 13000 Bruce B. Downs Boulevard, Tampa, FL 33612.
Period of performance is 180 days from Notice to Proceed.
MAGNITUDE OF CONSTRUCTION: Between $500,000 and $1,000,000
OFFICE ISSUING THIS REQUEST:
Department of Veterans Affairs
Network Contracting Office (NCO) 8
Point of Contact: Stacy Figlinski, Contracting Officer
Email: Stacy.Figlinski@va.gov