Y1DA--RENOVATE OPERATING ROOMS 541-19-101
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contract Office 10, has issued a Solicitation for the Renovation of Operating Rooms (Project 541-19-101) at the VA Medical Center in Cleveland, OH. This opportunity, classified under Construction of Hospitals and Infirmaries (Y1DA), involves significant structural and clinical improvements. Amendment 0001 has been released to provide answers to Request for Information (RFI) questions. Proposals are due June 22, 2026, at 12 PM EST.
Scope of Work
This project entails the renovation of operating rooms, including a surgical addition and clinical improvements. Key aspects of the scope include:
- Structural Work: Detailed building sections, roof framing plans (including a 3'-0" concrete slab with specific design loads of 240 PSF Dead Load and 250 PSF Live Load), reinforcement details, and lead-lined sections for areas like the Wade Park Linear Accelerator Addition. Field verification of existing conditions is required.
- Equipment Integration: Coordination with VA-provided Commissioning Agent Services (CxA) and a separate VA contract for surgical video integration (which is not part of the construction contractor's scope). The project will integrate pre-ordered equipment from TRUMPF Medical Systems for Phase 2 ORs.
- Patient Lifts: Installation of a fully functioning patient lift system with traversing rails; recessed rails are not required. Structural support for patient lifts is a required submittal.
- Fire Alarm System: The existing system is by Notifier.
- Vision Control Glass: Kyler Industries SL20A with integral blind is acceptable.
- Access & Logistics: Project access via existing construction anteroom, with freight elevator use permitted for materials. Debris removal must follow ICRA requirements. A proposed loading and unloading plan is required.
Key Clarifications (from RFI Q&A)
- Testing & Inspections: The General Contractor is responsible for providing special inspections and testing laboratory services.
- Unarmed Guard: A 24/7 unarmed guard is not required.
- Exclusions: Temporary procedure rooms 2-C231, 2-C232, 2-C233 and pillow speakers for nurse call are not within the scope of work.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified.
- Response Due: June 22, 2026, at 12 PM EST.
- Published Date: June 11, 2026.
- Amendment 0001: Published June 11, 2026, providing RFI Q&A.
Additional Notes
Bidders must carefully review the provided drawings and specifications, including building sections, roof framing plans, and typical details, for accurate cost estimation and proposal development. The RFI Q&A provides critical clarifications impacting technical details and responsibilities.